Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF DECEMBER 22, 2001 FBO #0020
PRESOLICITATION NOTICE

Z -- Steam Piping and Fin Tube Replacement

Notice Date
12/20/2001
 
Notice Type
Presolicitation Notice
 
Contracting Office
General Services Administration, Public Buildings Service (PBS), Property Management Division (6PMT-E), 1500 East Bannister Road, Kansas City, MO, 64131-3088
 
ZIP Code
64131-3088
 
Solicitation Number
GS06P02GYC0010
 
Response Due
1/8/2002
 
Archive Date
1/23/2002
 
Point of Contact
Patricia Blitgen, Contract Specialist, Phone (816) 823-2278, Fax (816) 823-2273, - Courtney Springer, Contract Specialist, Phone (816) 823-2276, Fax (816) 823-2284,
 
E-Mail Address
pat.blitgen@gsa.gov, courtney.springer@gsa.gov
 
Description
Pre-Invitation for Bid for Steam Piping and Fin Tubes Replacement located at Federal Records Center, 9700 Page Boulevard, Overland, MO. Time for completion: 260 calendar days after notice to proceed. Notice to proceed anticipated to be issued on March 11, 2002. Estimated cost range: $1,000,000 - $5,000,000. Work involves replacement of low-pressure steam heating, heating elements, and controls to a zone hot water system as specified in drawings and specifications. Base Bid work consists of demolition of all existing steam and condensate piping, valves, equipment, controls and trim for zone 3. Also included is the installation of new hot water supply and return piping valves, equipment, controls and trim for zone 3; removal of asbestos containing material; rebuilding existing pipe chase; relocating system furniture and equipment; installing electrical power and control for new equipment loads and repairing walls, ceilings and floor. All existing hot water zones or other steam heating zones not included in this contract shall remain fully functional at all times during the heating season. The following Options require the same scope of work as the base bid for each identified heating zone. Option No.1 - Heating Zone 2, Option No. 2 - Heating zone 5, Option No. 3 - Heating Zone 6 and Option No. 4 - Heating Zone 1. Work in heating system shall be done zone by zone according to each phase that is ordered out. All other zones not included in this contract shall remain fully functional at all times during the heating season. Asbestos Abatement competency qualification information will be required prior to award. No document charge or deposit is required. A subcontracting plan is required if award is anticipated to a large business. All responsible sources may submit a bid, which will be considered by the agency. Offers from Hub Zone small business concerns will receive a price evaluation preference per FAR 19.307. FAR Clause 52.219-4 Notice of Price Evaluation Preference for Hub Zone Small Business concerns shall apply.
 
Place of Performance
Address: Federal Records Center, 9700 Page Boulevard, Overland, MO
 
Record
SN20011222/00009285-011221090748 (fbodaily.com)
 

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.