FBO DAILY ISSUE OF OCTOBER 17, 2002 FBO #0319
SOURCES SOUGHT

Y -- Replacement of hydroelectric generator and associated step-up transformer with a Powerformer-type system.

Notice Date
10/15/2002
 
Notice Type
Sources Sought
 
Contracting Office
Bureau of Reclamation - Mid-Pacific Regional Office 2800 Cottage Way, Rm. E-1815 Sacramento CA 95825
 
ZIP Code
95825
 
Solicitation Number
03SP202013
 
Archive Date
10/11/2003
 
Point of Contact
Dion T. Steele Contract Specialist 9169785142 dsteele@mp.usbr.gov
 
E-Mail Address
Email your questions to Point of Contact above or IDEASEC HELP DESK
(EC_helpdesk@NBC.GOV)
 
Small Business Set-Aside
N/A
 
Description
The Bureau of Reclamation is seeking sources for a requirement to replace the existing hydroelectric generator and associated step-up transformer at the Folsom powerplant with a generator that can produce the same power output and can be directly connected to the high voltage circuit in the Folsom Switchyard. The existing generator is 3-phase rated at 69 MVA, 0.96pf, 13.8-kV but capable of 71.7 MVA continuously. The step-up transformer is a 3-phase, 13.6-kV to 115-kV rated 66 MVA. The replacement generator will be rated at 71.7 MVA 0.96 pf and will be capable of being directly connected to the 115-kV switchyard. Reclamation has determined that replacement of the existing generator and transformer with a high voltage generator will result in financial economies through reduced equipment replacement and maintenance costs and higher efficiency, and will be environmentally safer to operate. The existing equipment was originally installed in 1955. The generator was last rewound in 1972 by Westinghouse. The unit is operated as a peaking generator with two or more starts and stops per day. The efficiency of the existing generator has been tested at 98.2%. The new generator is expected to achieve an efficiency of at least 98.5% The required work includes manufacturing, furnishing, and installing all necessary generator and ancillary components from the turbine shaft, up to and including the high voltage bushing of the existing115-kV switchyard unit breaker. The work also includes a new excitation system and generator protection system. Since the powerplant is an integral part of the local electrical system and is necessary to ensure the system's reliability, the period of time that the unit is taken out of service for the installation must be minimized. As part of the installation, the contractor shall disassemble, remove, and dispose of the components not required for the replacement.
 
Web Link
Please click here to view more details.
(http://ideasec.nbc.gov/ecprod/owa/ec$cbd.sypfirstcount?P_SERVER_ID3=BR142520&P_OBJ_ID1=59270)
 
Place of Performance
Address: Folsom Dam Powerplant, Folsom, California
Zip Code: 958251898
Country: US
 
Record
SN00188326-W 20021017/021015213349 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.