Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 26, 2003 FBO #0513
SOLICITATION NOTICE

Y -- Torch Lake EPA Superfund Project - 4 Sites

Notice Date
4/24/2003
 
Notice Type
Solicitation Notice
 
Contracting Office
Department of Agriculture, Natural Resources Conservation Service, Midwest Regional Office, 2820 Walton Commons West, Suite 123, Madison, WI, 53718-6797
 
ZIP Code
53718-6797
 
Solicitation Number
NRCS-MI-3-22
 
Archive Date
6/30/2003
 
Point of Contact
Albert Bartek, Regional Contract Specialist, Phone 608-224-3035, Fax 608-224-3010, - Rosabeth Garcia-Sais, Realty/Property Specialist, Phone 608-224-3036, Fax 608-224-3010,
 
E-Mail Address
abartek@mw.nrcs.usda.gov, rsais@mw.nrcs.usda.gov
 
Description
Placement of a 6-inch layer of earthen cover material over approximately 116 acres of stamp sand at four different sites located in Houghton County Michigan. Major items of construction and estimated quantities are as follows: Structure removal onsite and offsite (LS); Pollution control (LS); Seeding and mulching (116 acres); Mobilization and demobilization (LS); Access roads (11,375 LF); Regrading areas (LS); Diversions and waterways (12,293 LF); Cover material (116 Acres); Shoreline protection riprap (2,697 Tons); Culverts 24"diameter (520 LF); Culvert 18"(240 LF); Culvert 60"x 40" arch (100 LF); Chain link 4' fence (4,015 LF); Gates (8 Each); Drainfill (784 CY); Structure removal 8'fence (LS); Chain link 8' fence (753 LF); Base soil (3,575 Ton); Lined channel/Outlet protection (1,768 Ton); Cover material riprap (5,191 Ton); Cover material rock (3,779 Tons); Recreation trail (2,318 LF) and field office construction trailer (LS). Estimated price range is $1 - $5 Million. Site showing will be held May 22, 2003 at 1 PM (EDT) at the UPPCO Building, 600 East Lakeshore Drive, Suite 2, Houghton, MI. The bid opening will be at the same location on June 19, 2003 at 1 PM (EDT). Notice to proceed will be issued on or about June 30, 2003 with construction to begin on or about July 7, 2003. Performance time is 173 days. Liquidated damages assessed at $1,200. per day. A bid guarantee of 20% of the bid amount must accompany your offer. All contractors and sub-contractors will be required to follow USDA, NRCS Safety Plan and all site workers must have the 24-hour Hazwoper Training prior to any construction activity. No materials from the job site, including cleared or grubbed material shall be burned on or off site. This is a requirement of the Environmental Protection Agency (EPA). Solicitation package with specifications and drawings will be posted to FEDBIZOPPS on or about April 30, 2003. Administrative questions should be addressed to Al Bartek, Contracting Officer at 608-224-3035 and technical questions to Bryan Hill, Project Engineer at 906-226-8871 x-4
 
Place of Performance
Address: U. S. Department of Agriculture, Natural Resources Conservation Service, 600 East Lakeshore Drive, Suite 2, Houghton, MI 49931-1868
Zip Code: 49931
Country: USA
 
Record
SN00310990-W 20030426/030424213329 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.