Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 06, 2003 FBO #0554
SOLICITATION NOTICE

28 -- Generator Rewind and Lift Pumps for Detroit/Big Cliff Dams, Oregon

Notice Date
6/4/2003
 
Notice Type
Solicitation Notice
 
Contracting Office
Portland District, US Army Corps of Engineers - Civil, Contracting Division (CENWP-CT), P.O. Box 2946, Portland, OR 97208-2946
 
ZIP Code
97208-2946
 
Solicitation Number
DACW57-03-R-0010
 
Response Due
7/22/2003
 
Archive Date
9/20/2003
 
Point of Contact
Dawn Simpson, (503) 808-4607
 
E-Mail Address
Email your questions to Portland District, US Army Corps of Engineers - Civil
(dawn.r.simpson@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
NA The Contractor shall furnish all supervision, engineering, labor, materials, plant, and equipment to perform the following work in strict accordance with the detailed requirements of the solicitation: BASIC REQUIREMENTS (1) Design, manufacture, shop test, prepare and load for shipment, deliver f.o.b. destination, and unload three new complete sets of stator coils and all accessories specified herein. Furnish three generator thrust bearing high pressure lift pump systems including design and materials/assemblies. Two sets are for Detroit and one set is for Big Cliff. (2) Furnish and deliver thrust bearing oil coolers complete with all valves, fittings, meters, gauges, piping, and related accessories. (3) Furnish and deliver generator air coolers complete with all valves, fittings, meters, gauges, piping, and related accessories. (4) Furnish and deliver guide bearing coolers complete with brackets, fittings, piping and related accessories. OPTIONAL WORK TO BE PERFORMED (1) Optional Installation At Big Cliff. (a) Disassemble and Reassemble the Generator. Mobilize and demobilize, perform the necessary pre-alignment readings, disassemble the generator to gain access to the stator, reassemble and align the unit. (b) Additional Mechanical Work ?????? Optional Items. Inspect, repair, and/or refurbish the bearings and other disassembled components, provide a new turbine shaft sleeve, perform extensive inspection and testing of the generator thrust bearing. (c) Stator Winding Installation and Test. Remove the old coils from the stator, clean and test the stator core, prepare the stator for rewinding, install and test the new stator winding and accessories specified herein, clean and test the rotor, and reas semble the generator. Install and test the generator thrust bearing high pressure lift pump system assemblies. (d) Generator Rotor. Clean, inspect, test, and paint the generator rotor. (e) Thrust Bearing Oil Coolers. Install thrust bearing oil coolers complete with all valves, fittings, meters, gauges, piping, and related accessories. (f) Generator Air Coolers. Install generator air coolers complete with all valves, fittings, meters, gauges, piping, and related accessories. (g) Guide Bearing Coolers. Install guide bearing coolers complete with brackets, fittings, piping and related accessories. (2) Optional First Installation at Detroit. (a) Disassemble and Reassemble the Generator. Mobilize and demobilize, perform the necessary pre-alignment readings, disassemble the generator to gain access to the stator, reassemble and align the unit. (b) Additional Mechanical Work ?????? Optional Items. Inspect, repair, and/or refurbish the bearings and other disassembled components, provide a new turbine shaft sleeve, perform extensive inspection and testing of the generator thrust bearing. (c) Stator Winding Installation and Test. Remove the old coils from the stator, clean and test the stator core, prepare the stator for rewinding, install and test the new stator winding and accessories specified herein, clean and test the rotor, and reas semble the generator. Install and test the generator thrust bearing high pressure lift pump system assemblies. (d) Generator Rotor. Clean, inspect, test, and paint the generator rotor. (e) Install thrust bearing oil coolers complete with all valves, fittings, meters, gauges, piping, and related accessories. (f) Install generator air coolers complete with all valves, fittings, meters, gauges, piping, and related accessories. (d) Install guide bearing coolers complete with brackets, fittings, piping and related accessories. (3) Optional Second Installation At Detroit. (a) Disassemble and Reassemble the Generator. Mobilize and demobilize, perform the necessary pre-alignment readings, disassemble the generator to gain access to the stator, reassemble and align the unit. (b) Additional Mechanical Work ?????? Optional Items. Inspect, repair, and/or refurbish the bearings and other disassembled components, provide a new turbine shaft sleeve, perform extensive inspection and testing of the generator thrust bearing. (c) Stator Winding Installation and Test. Remove the old coils from the stator, clean and test the stator core, prepare the stator for rewinding, install and test the new stator winding and accessories specified herein, clean and test the rotor, and reas semble the generator. Install and test the generator thrust bearing high pressure lift pump system assemblies. (d) Generator Rotor. Clean, inspect, test, and paint the generator rotor. (e) Thrust Bearing Oil Coolers. Install thrust bearing oil coolers complete with all valves, fittings, meters, gauges, piping, and related accessories. (f) Generator Air Coolers. Install generator air coolers complete with all valves, fittings, meters, gauges, piping, and related accessories. (f) Guide Bearing Coolers. Install guide bearing coolers complete with brackets, fittings, piping and related accessories. The administrative/contracting point of contact is Melanie Hubbard who can be reached by telephone at 503/808-4634, or by facsimile at 503/808-4605. The solicitation will be issued on CD-ROM on or about 20 June 2003 and the proposal due date is on or abou t 22 July 2003. A site visit is scheduled on or about 2 July 2003. Due to security precautions, the Contractor shall notify the Government in writing if foreign nationals plan to attend the scheduled site visit. The written notification shall be provide d to the attention of Ms. Hubbard, U.S. Army Corps of Engineers, CENWP-CT-S, PO Box 2946, Portland, OR 97208. The information shall be sent a minimum of two (2) weeks prior to the site visit. To request a copy of the solicitation, register at https://ww w.nwp.usace.army.mil/ebs. This solicitation is open to both large and small business concerns. The small business size standard for this solicitation is 1,000 employees. In order for contractors to conduct business with the Department of Defense, the co ntractor must provide registration information to the Central Contractor Registration (CCR). Contractors may access CCR at https://www.ccr.dlis.dla.mil/ccr/scripts/index.html. All responsible sources may submit an offer, which will be considered by the A gency. *** NAICS 335312, FSC Z211 ***
 
Place of Performance
Address: Portland District, US Army Corps of Engineers - Civil Contracting Division (CENWP-CT-S), P.O. Box 2946 Portland OR
Zip Code: 97208-2946
Country: US
 
Record
SN00339729-W 20030606/030604213619 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.