MODIFICATION
54 -- Furnish and install clear span free standing mezzanine
- Notice Date
- 8/27/2003
- Notice Type
- Modification
- Contracting Office
- Department of the Navy, Naval Supply Systems Command, FISC NORFOLK ACQUISITION GROUP, CODE 200 1968 GILBERT STREET, SUITE 600, NORFOLK, VA, 23511-3392
- ZIP Code
- 23511-3392
- Solicitation Number
- N00189-03-T-0571
- Response Due
- 9/11/2003
- Archive Date
- 9/26/2003
- Point of Contact
- Carolyn Johnson, Supervisor Purchasing Agent, Phone 757-443-1374, Fax 757-443-1376,
- E-Mail Address
-
carolyn.johnson@navy.mil
- Small Business Set-Aside
- Total Small Business
- Description
- The following questions and answers are in response to solicitation N00189-03-R-0571: 1. In order to quote on the installation, we'll need to look at the site, or exam a set of drawings that depict the installation area. How do I go about arranging one or both of these? Email Carolyn.Johnson@navy.mil to obtain a copy of the drawing. 2. Are standard stairs required door only a ladder? How many? Standard stairs-36", external per attached sketch. 3. Standard stairs are required, are they internal or external? Would they be perpendicular or parallel to the perimeter and how wide (24", 30", 36", etc.)? See answer to question #2 4. If only a ladder is required, how wide and is safety guarding required (caging around ladder)? See answer to question #2 5. If the deck thickness can be made thinner than that in the description (10'7" - 9'0" = 19" thick), what dimension should be held, deck elevation of 10'7" or clearance of 9'0"? Clearance 6. Is there any interest in an optional lighting package for this system? No 7. Clarification of system dimensions? Per attached sketch (email Carolyn.Johnson@navy.mil for sketch) 8. Free span, free span, just the 20"2 dim or does the customer have free span requirements for the length dimension as well? The only free span dimension requirement is for 16 ft. between posts to enable storage or trailers under mezzanine. Attached sketch depicts best solution to maximize storage capacity under mezzanine. 9. There is no mention of OSHA stairs for this mezzanine. Do to the size I am sure OSHA would require a min of 2 each stairs confirm # of stairs and or landings and placement. Not familiar with OSHA requirements. Require at least one stair as described above. 10. Hand railing around the full perimeter? Or are we butting the mezzanine against walls? Handrail around full perimeter..steam pipes prevent butting against walls. Need three 72" lift out gates for forklift loading to mezzanine level. 11. Finished deck material diamond plate? Or steel plate? There is difference in pricing. Diamond plate not preferred due to requirement for pallet jack operations. Open to any other type of material that will withstand traffic/material handling. 12. Will customer unload materials and stage? Will there be a forklift available to aid in installation? Should we include in bid package pricing for forklift rental? Delivery location is location of installation. Forklift and operator available for offload/staging. 13. Need more specifics on what kind of electrical power customer wants? No electrical power required. 14. Can installation be done during normal business hours with a minimum of 8 hours of access per day? Yes 15. Could you provide a drawing of the above-mentioned mezzanine? The "L" shape is not clear. Email Carolyn.Johnson@navy.mil for copy of drawing. 16. Are you requesting a vertical "ship's ladder" or a stairway? If it to a stairway, will you want a landing or will the stairs run perpendicular to the mezzanine. Stairway with landing per sketch. 17. Which is the critical dimension regarding heights: the 9' under clearance or the 10'7" top of deck. Clearance 18. Where do these units install? Warehouse 19. May this or these units have perimeter columns? Yes 20. Are the mezzanines totally rectangular without any deviations for buildings columns, piping, etc? Yes 21. Do the mezzanines require handrail and kick plate around their entire circumferences or does some of the outside perimeter of the mezzanine border the walls of the building? Handrail around full perimeter?steam pipes prevent butting against walls. Need three 72" lift out gates for forklift loading to mezzanine level. Solicitation is hereby extended until September 11, 2003.
- Record
- SN00414117-W 20030829/030827214231 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |