SPECIAL NOTICE
Y -- PROJECT PRESHOW FOR WYOMING PFH 23-1(2), LOUIS LAKE ROAD, SHOSHONE NATIONAL FOREST, FREMONT COUNTY, WY
- Notice Date
- 9/5/2003
- Notice Type
- Special Notice
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, Room 259 555 Zang Street, Lakewood, CO, 80228-1010
- ZIP Code
- 80228-1010
- Solicitation Number
- WY-PFH-23-1(2)
- Archive Date
- 10/3/2003
- Point of Contact
- Brenda McGehee, Acquisition Program Specialist, Phone (303) 716-2080, Fax (303)969-5971, - Lori K Rivera, Acquisition Program Specialist, Phone (303)716-2015, Fax (303)969-5971,
- E-Mail Address
-
bmcgehee@road2.cflhd.gov, lorik.rivera@fhwa.dot.gov
- Description
- A project in Fremont County, Wyoming, is tentatively schedule for advertisement in February 2004. This advanced notice is being given because weather and site conditions may prevent contractor viewing at the time of advertising for bids. Representatives from the Federal Highway Administration will conduct a site visit on Thursday, October 2, 2003, from 9 a.m. to approximately 4 p.m. A brief overview of the day's proposed schedule will be presented prior to the site visit. A formal questions and answer session will be held immediately following the site visit at the Best Western, 260 Grandview Drive, The WarBonnet Room, Lander, Wyoming. Questions will only be answered during the formal Q/A session. Minutes will be distributed at the time of advertisement as an appendix to the solicitation. Preliminary plan sets will be available for review during the site visit, but will be collected following the Q/A sessions. The Louis Lake Road project begins at Station 29+657, at Worthen Meadow Road, approximately 11.5 kilometers south of Bruce's Parking Area, and continues 11.5 km northerly to the beginning of pavement at Bruce's Parking Area, on the Sinks Canyon Road south of Lander. The work consists of grading, drainage, retaining walls, aggregate base, and asphalt surfacing. Major bid items include: lump sum contractor testing; 16 ha clearing and grubbing; 110,000 m3 roadway excavation; 1,000 m3 riprap (various); 1,000 m2 revet mattress; 2,800 m2 mechanically stabilized earth wall with welded wire face; 44,000 metric tons aggregate base; 17,000 metric tons asphalt concrete pavement; 1,487 metric tons surface treatment aggregate; 1,450 m culvert pipe (various); lump sump concrete arch culvert construction; 500 m underdrain; 2,000 m W-beam guardrail with wood posts; 10,000 m3 placing conserved topsoil; seeding; mulching; signing; pavement markings; erosion control; and traffic control. Those planning to attend should meet at 9 a.m. local time at the Best Western located at 260 Grandview Drive, Lander, WY. If you would like to attend the preshow, please contact Brenda McGehee at 303-716-2080 or Lori K Rivera at 303-716-2015 by September 25. ATTENDANCE AT THE PROJECT PRESHOW IS NOT MANDATORY TO BID THE PROJECT, HOWEVER ATTENDANCE IS ADVISED.
- Place of Performance
- Address: Shoshone National Forest, Fremont County, Wyoming
- Record
- SN00427114-W 20030907/030905220503 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |