Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 12, 2003 FBO #0654
SOLICITATION NOTICE

59 -- Replacement of Uninterrupted Power Supply

Notice Date
9/10/2003
 
Notice Type
Solicitation Notice
 
Contracting Office
12155 W. Alameda Parkway Lakewood, CO 80228-2802
 
ZIP Code
80228-2802
 
Solicitation Number
DE-AF65-03WN64283
 
Response Due
9/16/2003
 
Archive Date
10/16/2003
 
Point of Contact
Kimberly Ford, Contracting Officer, 916-353-4435, KFORD@wapa.gov;Lucy Boswell, Contract Specialist, 916-353-4537; 916-353-4537, BOSWELL@wapa.gov; BOSWELL@wapa.gov
 
E-Mail Address
Email your questions to Lucy Boswell, Contract Specialist
(BOSWELL@wapa.gov; BOSWELL@wapa.gov)
 
Small Business Set-Aside
N/A
 
Description
Western Area Power Administration, Sierra-Nevada Region, in Folsom, California has an urgent requirement for a replacement of its uninterrupted power supply system (UPS). Current system consists of 2 each Exide Electronics 200KVA, 160 KW Model # 3180AF. AC input: Volts 480, AMPS 314 max, Wires 3, Hertz 60; DC link: Volts 409, AMPS 621 max, Wires 2; AC output: Volts 480, AMPS 301 max, Wires 4, Hertz 000549. Batteries will only require augmentation based on specification changes of new UPS. Contractors are required to submit pricing for new hardware and equipment, removal of existing equipment, installation of new equipment, and loaded hourly rates for each skill proposed. All work must be performed "hot". Included in proposal shall be a Statement of Work that addresses specific work processes proposed, project timeline, "hot work" procedures, and any relevant certifications and insurance. System modifications may be required to allow for alternative feed current for maintenance, and if applicable, will be specified after award. Site visits may be scheduled through Lucy Boswell by e-mailing boswell@wapa.gov or by calling (916) 353-4537. If contractor requires site visit, visit must be scheduled by the closing date of 9-16-2003 and proposals must be submitted 2 days after scheduled visit.
 
Web Link
Click here for further details regarding this notice.
(https://e-center.doe.gov/iips/busopor.nsf/UNID/04C28FCD36842F6B85256D9E00082A01?OpenDocument)
 
Record
SN00430771-W 20030912/030910213127 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.