Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 20, 2004 FBO #0998
MODIFICATION

A -- Groundwater Conveyance System

Notice Date
8/18/2004
 
Notice Type
Modification
 
Contracting Office
100 Kindel Drive Suite A332 Arnold AFB, TN, 37389
 
ZIP Code
37389
 
Solicitation Number
FA9101-04-B-0022
 
Response Due
9/17/2004
 
Archive Date
12/15/2004
 
Point of Contact
Tony Clayborne, Contracting Officer,(931) 454-3918
 
E-Mail Address
Email your questions to Tony.Clayborne@arnold.af.mil
(Tony.Clayborne@arnold.af.mil)
 
Small Business Set-Aside
N/A
 
Description
This requirement is for the construction of a groundwater conveyance system to deliver groundwater from extraction wells located near the Arnold AFB airfield to a treatment system located in a building near the J-4 Test Cell, a distance of approximately 9,500 feet. The treatment system will be upgraded to expand the capacity of the existing system. The conveyance pipeline will be a force main constructed of 4-inch and 6-inch diameter HDPE pipe, and will generally follow existing road right-of-way. Five groundwater extraction wells will be installed by the Government under separate contract to include drilling, casing installation, and development of the wells. Submersible well pumps will be Government Furnished Property (GFP) as a part of this contract. The requirement includes the following major work elements: Installation of the extraction well pumps; Extraction well head assembly and vaults including concrete vault, access hatch, discharge piping, header pipe, valves, flow meters, flow meter vaults, and well system controls; Duplex lift station package including five horsepower submersible pumps with integral controls, sliderails, concrete sump, access hatch, discharge piping, valves, and valve box; Groundwater conveyance piping system, including clean-outs and air-release valves; Upgrades to the existing J-4 groundwater treatment system, including addition of two new Carbonair STAT180 low-profile air strippers to match existing equipment, process piping modifications, and electrical wiring; Extraction well, lift station, and treatment system process instrumentation and controls, including primary elements, transmitters, control devices, control panels, programmable logic controllers, interfaces with existing control systems, fiber optic networks, and autodialer communications; Electrical power equipment, wiring and connections including overhead electrical distribution, motor controls, lighting, grounding, and pipe heat tracing; Telephone service wiring and connection for autodialer equipment; Site work, including, erosion and sediment controls during construction, post-construction site stabilization, and approximately 550 lineal feet of gravel access road. The estimated construction magnitude is between $500,000 and $1,000,000. The performance period shall be 210 calendar days after issuance of a notice to proceed. For more information on 04B0022AR--Groundwater Conveyance System please refer to http://www.pixs.wpafb.af.mil/pixslibr/04B0022AR/04B0022AR.asp
 
Web Link
04B0022AR-Groundwater Conveyance System
(http://www.pixs.wpafb.af.mil/pixslibr/04B0022AR/04B0022AR.asp)
 
Record
SN00646355-W 20040820/040818212044 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.