Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF NOVEMBER 24, 2004 FBO #1094
SOLICITATION NOTICE

53 -- Bolt, Self, Retaining

Notice Date
11/22/2004
 
Notice Type
Solicitation Notice
 
NAICS
332722 — Bolt, Nut, Screw, Rivet, and Washer Manufacturing
 
Contracting Office
US Army Aviation and Missile Command (Aviation), ATTN: AMSAM-AC, Building 5303, Martin Road, Redstone Arsenal, AL 35898-5280
 
ZIP Code
35898-5280
 
Solicitation Number
W58RGZ-05-R-0234
 
Response Due
1/5/2005
 
Archive Date
3/6/2005
 
Small Business Set-Aside
N/A
 
Description
****ATTENTION****FORMAL COMMUNICATION RELATED TO THIS ACQUISITION SHOULD BE DIRECTED TO Raymond Washington, Contract Specialist. YOU MAY FAX OR MAIL YOUR REQUEST ATTN: AMSAM-AC-CH-B, Raymond Washington, Contract Specialist, (256) 955-8393, fax (256) 842-6302, or e-mail: raymond.washington@peoavn.redstone.army.mil. NO TELEPHONE REQUESTS WILL BE ACCEPTED. PRON: AX5C0037AX, NSN: 5306-00-008-8853, PN: 114CS129-2 QUANTITY: Min: 158 each/Max: 790; 5 Year Indefinite Delivery/ Indefinite Quantity (I DIQ) Contract, applicable to the CH-47, with deliveries to New Cumberland, PA 17070-5001. This is a Flight Safety Part. This item is restricted to Boeing Helicopter Cage Code 77272 and SPS Technologies Inc. Cage 80539. This part requires engineering sourc e approval by the design control activity in order to maintain the quality of the part. Existing unique design capability, engineering skills, and manufacturing knowledge by the qualified source(s) require acquisition of the part from the approved source( s). The approved source(s) retain data rights, manufacturing knowledge is essential to maintaining the quality of the part. An alternate source must qualify in accordance with the design control activitys procedures, as approved by the cognizant Governm ent engineering activity. The qualification procedures must be approved by the Government engineering activity having jurisdiction over the part in the intended application. A Contractor First Article is required. Production Lead-time with First Article Testing is 158 each, 375 Days After contract Award (DACA). Production Lead-time without First Article Testing is 158 each, 250 DACA. Production Lead-time with Article II Clause is 158 each, 313 DACA. Firms that can produce the required item described a bove are encouraged to identify themselves. Firms are encouraged to seek source approval in order to compete for future solicitations by accessing the website www.redstone.army.mil/cmo/ and looking under CAPSAR and Policy Relating to Source Approval Reque st (SAR) for Aviation requirements. The closing date annotated is an estimated date and may be adjusted dependent upon the date of release of solicitation; however, solicitation will not close prior to the closing date stated above. Foreign firms are re minded that all requests for solicitation must be processed through their respective embassies. Adequate technical data is not available for this acquisition. All offerors must meet prequalification requirements in order to be eligible for award. All re sponsible sources may submit an offer, which shall be considered by the Agency. NOTES: 23 and 26
 
Place of Performance
Address: US Army Aviation and Missile Command (Aviation) ATTN: AMSAM-AC, Building 5303, Martin Road Redstone Arsenal AL
Zip Code: 35898-5280
Country: US
 
Record
SN00711773-W 20041124/041122211911 (fbodaily.com)
 
Source
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.