MODIFICATION
Y -- Design/Build of Replace Military Family housing, Phase 11, Minot AFB, North Dakota
- Notice Date
- 1/11/2005
- Notice Type
- Modification
- NAICS
- 236116
— New Multifamily Housing Construction (except Operative Builders)
- Contracting Office
- US Army Corps of Engineer - Omaha District, 106 S. 15th Street, Omaha, NE 68102-1618
- ZIP Code
- 68102-1618
- Solicitation Number
- W9128F-05-R-0004
- Response Due
- 2/9/2005
- Archive Date
- 4/10/2005
- Small Business Set-Aside
- N/A
- Description
- On or about 01 December 2004, this office will issue Request for Proposal (RFP) for the Design/Build of REPLACE MILITARY FAMILY HOUSING, PHASE 11, MINOT AFB, NORTH DAKOTA. Proposals will be received on or about 09 February 2005. This solicitation is unrestricted and open to both large and small business participation. Phase 11 Work (Approx. quantities) The FY05, Phase 11 work consists of demolition of 168 existing housing units and replacing with 142 new units. New units shall be duplex configuration for SNCO units and detached single-family dwellings for FGO and SO units. Design and construction consi sts of grade mixes of SNCO, FGO and SO three and four bedroom units throughout the Phase 11 site. Infrastructure work includes utility upgrades, road improvements, landscaping, paving, etc. All units will require double-car garages, central air condition ing, refrigerators, garbage disposals, dishwashers, water heaters, range/ovens, automatic garage door openers, carbon monoxide detectors and smoke detectors. RFP Evaluation Firms participating in the RFP will submit technical requirements in accordance with Section 00110: PROPOSAL SUBMISSION AND EVALUATION. Submissions will be evaluated based on the best value approach considering technical elements for evaluation (e.g., Expe rience, Past Performance, Project Management, Concept Design (Housing and Site), Utilization of Small Business, and Price. An adjectival method of evaluation will be used to evaluate the technical factors. Price will be comparatively evaluated for reason ableness. The estimated construction cost of Phase 11 is between $30,000,000 and $40,000,000. Contractor's Quality Control will be a requirement in this contract. Large business concerns submitting bids for services exceeding $500,000 or for construction exceeding $1,000,000, shall comply with Federal Acquisition Regulation 52.219-9 regarding the requirement for a subcontracting plan. The U.S. Army Corps of Enginee rs considers the following goals reasonable and achievable for fiscal year 2004: (a) Small Business: 50.9% of planned subcontracting dollars. (b) Small Disadvantaged Business: 8.8% of planned subcontracting dollars*. (c) Women Owned Small Business: 7.2% of planned subcontracting dollars*. (d) Service-Disabled Veterans: 0.5% of planned subcontracting dollars*. (e) Hubzones: 2.9% of planned subcontracting dollars*. *- Small business concerns owned and controlled by. The selected Offeror will be required to commence work 10 days after notice to proceed is given and complete the work within the Offerors proposed schedule for the contract. Offerors Schedule will include all design, design reviews, and construction com pletion. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required. Bonding documents including the power of attorney shall bear an original signature by a n officer of the surety. The RFP documents are available on Compact Disk (CD-ROM) and will be provided free of charge. It has been determined that the number of Compact Disks be limited to one (1) per firm. Plans and Specifications will not be provided in a printed hard copy forma t. Contractors may view and/or download this project from the Internet at the following Internet address: http://ebs-nwo.wes.army.mil/] Ordering of RFP on CD-ROM shall be by registering on the Omaha District website: http://ebs-nwo.wes.army.mil/. To register on the Omaha District website, go to the Solicitation Registration section of the synopsis and click on the link for Registering. If any of the information changes during the advertisement period, you must make changes through the Omaha District web address. Failure to provide the above information and any changes may cause a delay in receiving CD-ROM and amendments. Questions rega rd ing the ordering of the same should be made to: 402 221 4298. Telephone calls regarding Small Business matters should be made to: 402 221 4110. Telephone calls on contents of the RFP should be made to the Project Manager at: (402) 221-3985, Specification Section at: (402) 221 4413 or Contracting Division at (402) 221-4298. Commander U.S. Army Engineer District, Omaha ATTENTION: CENWO-CT-M 106 South 15th Street Omaha, NE 68102 1618
- Place of Performance
- Address: US Army Corps of Engineer - Omaha District 106 S. 15th Street, Omaha NE
- Zip Code: 68102-1618
- Country: US
- Zip Code: 68102-1618
- Record
- SN00733106-W 20050113/050111211930 (fbodaily.com)
- Source
-
FedBizOpps.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |