Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF SEPTEMBER 23, 2006 FBO #1762
SOLICITATION NOTICE

Y -- WY PFH 4-1(4), Beartooth Highway

Notice Date
9/21/2006
 
Notice Type
Solicitation Notice
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, CO, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-06-B-00029
 
Archive Date
3/30/2007
 
Description
This notice to provide information to the contracting community of the upcoming advertisement of the WY PFH 4-1(4), Beartooth Highway project. The project will consist of the reconstruction of U.S.212 (Beartooth Highway) located in Park County, Wyoming, beginning approximately 9.5 miles east of the U.S.212 & S.R.296 intersection in northeast Wyoming. The project is located predominately on new alignment, consisting of a Schedule A and Schedule B between stations 44+700 +/- and 47+800 +/-, and will include one or two bridges within these limits, depending on the Schedule awarded. The project limits are approximately from just west of Little Bear Creek west of the Top of the World Store to the Island Lake Campground approach road located east of the Top of the World Store. The project will include earthwork with some rock excavation, precast box-beam bridge construction utilizing micropile supported foundations with stone masonry abutments and wingwalls, grading and draining, paving, and wetland and stream restoration and creation. The project alignment (Option A) and typical cross-section within the above limits is depicted on Figures 2 and 3, Pages 6 and 7, respectively, in the Record of Decision at the website: http://www.cflhd.gov/projects/wy/beartooth/ROD/ROD.pdf . More detailed alignment information for Option A is depicted on Figure 6, Pg. 37 of the FEIS at: http://www.cflhd.gov/projects/wy/beartooth/FEIS/FEISChapter2.pdf.Contractors will be required to ensure compliance with commitments described in Section 1.5 Measures to Minimize Harm, of the Record of Decision. It is desired to begin construction as soon as possible in the spring of 2007 and complete the project prior to winter shutdown in 2008. Night closures of the roadway for work will be allowed Monday through Thursday from 8 p.m. to 8 a.m., with no closures allowed Friday through Sunday. Maximum motorist delays of 30 minutes will be allowed through the project area. FHWA anticipates advertising this project in the winter of 2007. The estimated price range is between $4,000,000 and $8,000,000. Technical questions specific to the project will only be addressed by FHWA via written correspondence to e-mail address CFLContracts@fhwa.dot.gov or FAX to (720) 963-3360. PLEASE NOTE: The Invitation for Bid will be available for download from the Federal Business Opportunities (FedBizOpps) website at www.fedbizopps.gov on or before the advertisement date. PLANS WILL BE AVAILABLE FOR DOWNLOAD IN ADOBE (.pdf) FORMAT ONLY ON CFLHD's WEBSITE at http://www.cflhd.gov/procurement/construction/advertised-projects.cfm under the Project Name. In order to view the plans, interested vendors must register through the CFL website. Other information regarding this solicitation is available only from FHWA Lakewood Office. Please call (720) 963-3353 or (720) 963-3351 or visit http://www.cflhd.gov/procurement/construction/advertised-projects.cfm
 
Place of Performance
Address: Shoshone National Forest,, Park County, Wyoming
Zip Code: 82414
Country: UNITED STATES
 
Record
SN01150628-W 20060923/060921220635 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.