SOLICITATION NOTICE
Y -- Generator Rewind Units 4 and 6, Big Bend Powerhouse; Fort Thompson, SD
- Notice Date
- 10/10/2006
- Notice Type
- Solicitation Notice
- NAICS
- 237130
— Power and Communication Line and Related Structures Construction
- Contracting Office
- US Army Corps of Engineer - Omaha District, 106 S. 15th Street, Omaha, NE 68102-1618
- ZIP Code
- 68102-1618
- Solicitation Number
- W9128F-07-R-0003
- Response Due
- 12/5/2006
- Archive Date
- 2/3/2007
- Small Business Set-Aside
- N/A
- Description
- On or about 19 October 2006, this office will issue Request for Proposal for the construction of Generator Rewind Units 4 and 6, Big Bend Powerhouse; Fort Thompson, SD. Bids will be opened on or about 05 December. This solicitation is unrestricted a nd open to both large and small business participation. Unit 6 will be made available to contractors the afternoon of November 14th and the morning of November 15th. Contractors interested in inspecting the site of the proposed work should contact Trevor McDonald, U.S. Army Corps of Engineers, Bend Project, HC 69, Box 74, Chamberlain, SD 57325. Tele: (605) 245-2331 x3002. DO NOT submit requests for plans and specifications to the site visit personnel listed above. See Obtaining Solicitation Documents below. The work will include the following: (Approx. quantities) Restack & Rewind Big Bend Unit 6 Generator with options to Restack & Rewind Big Bend Unit 4 Generator. Generators are rated 61,579 kVA, 0.95 power factor, 13,800 Volt, 3phase, 60Hz, 81.8 RPM, 115% overload capability. Contractor to design, manufacture, in stall, test, and commission new stator coils and core laminations for the hydro-generators at the Corps of Engineers Big Bend power plant near Fort Thompson, SD. The estimated construction cost of this project is between $5,000,000 and $7,500,000. Contractor's Quality Control will be a requirement in this contract. Large business concerns submitting bids for services exceeding $500,000 or for construction exceeding $1,000,000, shall comply with Federal Acquisition Regulation 52.219-9 regarding the requirement for a subcontracting plan. The U.S. Army Corps of Enginee rs considers the following goals reasonable and achievable for this contract: (a) Small Business: 51.2% of planned subcontracting dollars. (b) Small Disadvantaged Business: 8.8% of planned subcontracting dollars*. (c) Women Owned Small Business: 7.3% of planned subcontracting dollars*. (d) Service-Disabled Veterans: 1.5% of planned subcontracting dollars*. (e) Hubzones: 3.1% of planned subcontracting dollars*. *- Small business concerns owned and controlled by. The Contractor will be required to commence work within 10 days after notice to proceed and complete the work 720 calendar days after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required. Bonding documents including the power of attorney shall bear an original signature by an officer of the surety. Bidders (Offerors): Please be advised of on-line registration requirement in Central Contractor Registration (CCR) database http://www.ccr.gov/ and directed solicitation provisions concerning electronic annual On-line Representations and Certifications (ORCA) at http://orca.b pn.gov. Representations and certifications are required to updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or u pdate to ORCA. Obtaining Solicitation Documents: This office will no longer send copies (paper or CDS) of amendments and solicitations to interested parties. Solicitation documents will be posted on Federal Technical Data Solutions (FedTeDS). FedTeDS is a web-based dissemination tool designed to safegua rd acquisition-related information. When solicitation documents have been issued and posted to FedTeDs, synopsis or pre-solicitation notice will be amended and a link provided to access FedTeDS*. The process to download from FedTeDS is: 1. Find solicitation announcement in Fed Biz Opps (www.fbo.gov) 2. *Once you open the bid announcement on Fed Biz Opps, there will be a link to the solicitation on FedTeDS. Click on the link. 3. If you are a first time user, you will have to re gister** (see info included below); if not log in and open the solicitation. 4. Once you have the solicitation open, you can begin downloading the various files to your location. **Registration instructions can be found on the FedTeDS website (https://www.fedteds.gov) by clicking on the Register with FedTeDS hyperlink. Interested bidders should select the Begin Vendor/Contractor Registration Process option. The information lis ted below is required to register. 1. Central Contractor Registration (CCR) Marketing Partner Identification Number (MPIN) 2. DUNS Number or CAGE code 3. Telephone Number 4. E-Mail address Questions regarding the ordering of the same should be made to: 402 221 4134. Telephone calls regarding Small Business matters should be made to: 402 221 4110. Telephone calls on contents of drawings and specifications should be made to the Project Manag er at: (402) 221 - 4684 or Specification Section at: (402) 221 4411. Commander U.S. Army Engineer District, Omaha ATTENTION: CENWO-CT-C 106 South 15th Street Omaha, NE 68102 1618
- Place of Performance
- Address: US Army Corps of Engineer - Omaha District 106 S. 15th Street, Omaha NE
- Zip Code: 68102-1618
- Country: US
- Zip Code: 68102-1618
- Record
- SN01163505-W 20061012/061010220638 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |