MODIFICATION
47 -- Pipe, Nickel-Chromium-Iron, MIL-DTL-23227F, Level I Material
- Notice Date
- 2/9/2007
- Notice Type
- Modification
- Contracting Office
- N00189 Building 153, 6th Floor Portsmouth, NH
- ZIP Code
- 00000
- Solicitation Number
- N0018907RPC04
- Response Due
- 3/9/2007
- Archive Date
- 6/30/2007
- Point of Contact
- Mike Levesque (207) 438-1630 Mike Levesque (207) 438-1630
- Description
- 47-Pipe, nickel-chromium-iron alloy in accordance with MIL-DTF-23227F, Type 2 or 3, Class IV, Finish A or C. 1,723 inches of 3 inch NPS, Schedule 160 and 1,220 inches of 5 inch NPS Schedule 160. Level I Material, Successful contractor shall maintain a quality assurance / inspection system in accordance with Mil-I-45208A, ISO-9001 or ISO-9002. Chemical and physical property test reports are required on the pipe along with ultrasonic test and alloy identity reports. The solicitation will contain all applicable specification requirements. All responsible, responsive offers will be considered.
- Record
- SN01229690-W 20070211/070209221201 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |