Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 25, 2007 FBO #1917
MODIFICATION

16 -- CYLINDER ASSEMBLY and PULLEY, GROOVE for C-5 ACFT

Notice Date
2/23/2007
 
Notice Type
Modification
 
NAICS
336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
 
Contracting Office
Department of the Air Force, Air Force Materiel Command, WR-ALC, WR-ALC/PK Acquisition Opportunities 235 Byron St,, Warner Robins, GA, 31098-1611, UNITED STATES
 
ZIP Code
00000
 
Solicitation Number
FA8524-07-Q-10206
 
Response Due
3/12/2007
 
Archive Date
6/30/2007
 
Point of Contact
Sherie Hooper, Contracting Officer, Phone (478)926-0152, Fax (478)926-0154,
 
E-Mail Address
Sherie.Hooper@robins.af.mil
 
Small Business Set-Aside
Total Small Business
 
Description
Solicitation Amendment is being issued for this solicitation. An updated drawing package is available for NSN 1680-01-162-7371UC, CLIN 0001, as one drawing was missing. Required delivery dates are changed for CLIN 0001 and 0002 for First Article test report, First Article and Production Units. %% This is for a firm fixed-price contract applicable to the C-5 aircraft. Item 0001 - NSN: 1680-01-162-7371UC; NOUN: Cylinder Assembly; P/N: 4C52997-107A, QTY: 1 each First Article plus 4 each Production Quantity. DIM: 6 inches high x 4 inches wide, 4 pounds. MATL: Steel. FUNC: Sub-component of C-5 Rudder control system, provides method of providing feedback resistance to pilot during rudder movement. DLVY: First Article test plan due 60 days after contract award, First Article test report due 300 days after contract award. Item 0002 - NSN: 3020-00-825-4024UC; NOUN: Pulley, Groove; P/N: 4C21007-101A, QTY: 1 each First Article only. DIM: 2 inches high x 6 inches wide, 2 pounds. MATL: Steel. FUNC: Sub-component of C-5 Elevator control system, provides a constant tension on the control system cables during accent and decent of the A/C. DLVY: First Article test plan due 60 days after contract award, First Article test report due 340 days after contract award. Information on updated drawing package is noted on the solicitation amendment. Solicitation will be available for viewing or downloading at www.fedbizopps.gov only. No telephone requests. NO HARD COPIES WILL BE ISSUED. All responsible sources solicited may submit a bid, proposal, or quotation, which shall be considered. See Numbered Notes 1, 8, 26. See WRALC Local Note F available at http://pkec.robins.af.mil/wrlcnts.htm.
 
Record
SN01237977-W 20070225/070223221332 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.