SOLICITATION NOTICE
Z -- Bridge Creek Bridge
- Notice Date
- 2/28/2007
- Notice Type
- Solicitation Notice
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-1 Clearwater National Forest, 12730 Highway 12, Orofino, ID, 83544, UNITED STATES
- ZIP Code
- 00000
- Solicitation Number
- R1-5-07-014
- Description
- Project consists of the removal of an existing 72-inch corrugated metal pipe and installation of a treated timber bridge with precast concrete grade beam abutments. The new structure will allow for maintaining the natural stream bottom and channel properties for fish passage. Water will be diverted around the construction site. There is approx. 3-5 feet of fill over the existing culvert. Work includes culvert removal, construction and installation of new structure, rebuilding the road approaches to the new structure, and placing surface aggregate and riprap. Road closure will be limited to 2 weeks between July 9 and August 24, 2007. Project site is at milepost 11.0 on the Savage Pass Road 360. To access the project, take the Elk Summit Road 111 from MP 163 on Highway 12 (1.5 miles east of Powell), to Road 360. Follow Road 360 for 11 miles. There are pictures avail for viewing as there will be no pre-bid tour. Proj. est. cost $25,000-$100,000. Estimated start work date 7/9/07.
- Place of Performance
- Address: 12730 Highway 12, Orofino, ID
- Zip Code: 83544
- Country: UNITED STATES
- Zip Code: 83544
- Record
- SN01240550-W 20070302/070228220341 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |