Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 26, 2008 FBO #2434
SOURCES SOUGHT

99 -- Gloveboxes in Process Area of MFFF

Notice Date
7/24/2008
 
Notice Type
Sources Sought
 
NAICS
332313 — Plate Work Manufacturing
 
Contracting Office
Department of Energy, Shaw AREVA MOX Services, LLC (MOX Services), Shaw AREVA MOX Services, LLC (MOX Services), Savannah River Site, P.O. Box 7097, Aiken, South Carolina, 29804-7097
 
ZIP Code
29804-7097
 
Solicitation Number
10888-R-GMEGLOVEBOX
 
Archive Date
8/26/2008
 
Point of Contact
Hector I. Lopez-De Jesus,, Phone: 803 819-2329, Peter J. Cosgriff,, Phone: (803) 819-2882
 
E-Mail Address
hdejesus@moxproject.com, pcosgriff@moxproject.com
 
Small Business Set-Aside
N/A
 
Description
Shaw AREVA MOX Services, LLC (MOX Services), operating under U. S. Department of Energy (DOE) Prime Contract DE-AC02-99CH10888, is the Prime Contractor for the Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF) Project to be built at the Savannah River Site (Aiken, South Carolina, USA). Under the Terms and Conditions of the Prime Contract, MOX Services is responsible for the procurement of Supplies, Services, and Construction in support of the MOX Project. MOX Services is seeking potential vendors for the Manufacturing (Build to Print) of twelve (12) Gloveboxes (GB) situated in process area of the Mixed Oxide (MOX) Fuel Fabrication Facility. The GME package is made up of the following 12 Gloveboxes: GME*GB2000 : Handling Glovebox Design: This Glovebox is made up of 8 small gloveboxes linked by flanges. This GB ensures the transfer of the rods to the different process GBs. Frame type. Bottom plate 30mm thick, thickness of the shell: 6mm. Dimension: Length: 50 ft, Width: 15 ft, Height: 2ft Material: Austenitic Stainless Steel 304L GME*GB3XXX: Rod filling Line In the Process Unit, there are 2 identical filing lines: GME *GB3000A and GME*GB3000B. Each line is made up of the following Gloveboxes: GME*GB3100: Stack preparation Glovebox Design: Shell type. Bottom plate 30mm thick, thickness of the shell: 6mm. Dimension: Length: 8 ft, Width: 4 ft, Height: 9ft Material: Austenitic Stainless Steel 304L GME*GB3200: Tube filling Glovebox Design: Shell type. Bottom plate 30mm thick, thickness of the shell: 6mm. Dimension: Length: 4 ft, Width: 4 ft, Height: 7ft Material: Austenitic Stainless Steel 304L GME*GB3300: Cleaning Glovebox GME*3400: Plugging Glovebox Design: these 2 GB are in fact one GB with a separation wall Shell type. Bottom plate 30mm thick, thickness of the shell: 6mm. Dimension: Length: 10 ft, Width: 4 ft, Height: 7ft Material: Austenitic Stainless Steel 304L GME*GB4000: Welding Glovebox Design: Shell type. Bottom plate 30mm thick, thickness of the shell: 6mm. Dimension: Length: 7 ft, Width: 4 ft, Height: 7ft Material: Austenitic Stainless Steel 304L GME*GB5XXX: Decontamination Line This line is made up of 3 Gloveboxes GME*GB5100: Decontamination Glovebox GME*GB5300: Non contamination checking Glovebox Design: These 2 GB are in fact one GB with a separation wall. Shell type. Bottom plate 30mm thick, thickness of the shell: 6mm. Dimension: Length: 7 ft, Width: 6 ft, Height: 7ft Material: Austenitic Stainless Steel 304L GME*GB5200: Storage Glovebox Design: Frame Type. Bottom plate 30mm thick, thickness of the shell: 6mm. Dimension: Length: 15 ft, Width: 6 ft, Height: 5 ft Material: Austenitic Stainless Steel 304L GME*GBXXX Repair Line This line is made up of 3 Gloveboxes GME*GB6100: Cutoff Glovebox GME*GB6200: Cleaning Glovebox Design: These 2 GB are in fact one GB with a separation wall. Shell type. Bottom plate 30mm thick, thickness of the shell: 6mm. Dimension: Length: 7 ft, Width: 6 ft, Height: 7ft Material: Austenitic Stainless Steel 304L GME*GB6300: Replugging Glovebox Design: These 2 GB are in fact one GB with a separation wall. Shell type. Bottom plate 30mm thick, thickness of the shell: 6mm. Dimension: Length: 7 ft, Width: 6 ft, Height: 7ft Quality Assurance Program Overview: MOX Quality Level 1 (and designated Level 2) related contracts require supplier commitment to fully meet the MOX Project Quality Assurance Plan commitments and requirements. Examples include: 1.10 CFR 50, Appendix B, as implemented through ASME NQA-1-1994, as revised by 1995 addenda; and Regulatory Guide 1.28 (Rev. 3) 2.ASNT-TC-1A, 1988 Edition 3.10 CFR 21- Requirements for “Reporting of Defects and Noncompliance” 4.Commercial Grade dedication process written to an industry recognized standard. (e.g., CGI dedication guidelines, EPRI NP5652). In addition, these requirements must be “flowed down” to respective sub-tier suppliers.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=16aaacc2dc0b52069f98781b1f56f237&tab=core&_cview=1)
 
Place of Performance
Address: Shaw AREVA MOX Services, LLC/Savannah River Site, Aiken, South Carolina, 29808, United States
Zip Code: 29808
 
Record
SN01621926-W 20080726/080724221558-16aaacc2dc0b52069f98781b1f56f237 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.