Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF NOVEMBER 12, 2008 FBO #2543
SOLICITATION NOTICE

15 -- Procurement of E6B/Equalization Discharge Fixture

Notice Date
11/10/2008
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
335911 — Storage Battery Manufacturing
 
Contracting Office
Department of the Navy, Naval Air Systems Command, Naval Air Warfare Center Aircraft Division Pax River, Building 441, 21983 Bundy Road Unit 7, Patuxent River, Maryland, 20670, United States
 
ZIP Code
20670
 
Solicitation Number
N00421-09-T-0005
 
Response Due
11/25/2008
 
Archive Date
12/31/2008
 
Point of Contact
Helen H Choo,, Phone: (301) 757-9056, Michelle L Briscoe,, Phone: (301) 757-9739
 
E-Mail Address
helen.choo@navy.mil, briscoeml2@navair.navy.mil
 
Small Business Set-Aside
N/A
 
Description
1.0Scope 1.1General This Statement of Work (SOW) defines the requirements of the contractor to provide engineering and prototyping of an Equalization Discharge Fixtures capable of discharging the M81757/18-1 battery cells to zero volts in less than sixteen hours. 2.0 Requirements The fixture design must meet the requirements of MIL-PRF-81757/18(AS), and must fit both M81757/18-1 battery cell layouts depicted in MIL-PRF-81757/18(AS) or technical manual T.O. 8D2-28-2. Additionally the following requirements must be met: -Fixture must be capable of discharging the M8175/18-1 battery cells to 0.0 volts in less than 16 hours -Fixture discharge posts (or pins) MUST fit both M81757/18-1 battery cell lay-outs as shown in MIL-PRF-81757/18(AS) and/or technical manual T.O. 8D2-28-2. -Fixture must fasten to battery utilizing the batteries four latches. -Fixture must have a carrying handle. -Functional Configuration Audit (FCA) and Physical Configuration Audit (PCA) will be required, prior to acceptance by the government. -Fixture must be properly marked with part number and serial number; Identification plate and contain UID. -Initial drawings to include, top level assembly with schematics and corresponding parts list. -Final drawings will be required for review prior to FCA/PCA. -One prototype assembly will be required for FCA/PCA. -Utilization of best commercial practices. -Operator’s manual or instructions required for use of the fixture and updating government technical manuals. Instructions in either Adobe PDF format or Word Document are acceptable. -Total number of fixtures required: 10 2.1 Functional/ Physical Configuration Audit (FCA/PCA) A FCA/PCA shall be conducted by the Government on the Prototype to examine the as-built equipment configuration against its technical documentation, for the purposes of establishing product baseline. The FCA/PCA will be conducted at the Contractor’s facility. Any discrepancies noted during FCA/PCA will be submitted to the Contractor at the end of each day. The Contractor is responsible for the correction of all discrepancies noted during FCA/PCA prior to acceptance by the government. 2.1.1 Government to Provide The government will provide to the contractor the following at Project Award. -Layout references of interior components for both M81757/18-1 layouts. -Copy of MIL-PRF-81757/18(AS) -Battery samples of each layout-for contractor to perform form, fit, and function. -Drawings pertaining to Equalization Discharge Fixture Assembly designed for NBC-1A, BATTERY CHARGER/ANALYZER, NICAD. 2.3 System Warranty The Contractor shall provide a one-year warranty. Any Fixture returned to the Contractor under this Warranty shall be replaced at Contractor expense at no additional cost to the Government. The Contractor shall provide a list of all items covered under this warranty. Contractor format is acceptable. Specification / Requirements Requirement An Equalization Discharge Fixture for the M81757/18-1 Battery capable of discharging to zero volts in less than sixteen hours; additionally. 1.Functional Configuration Audit (FCA) and Physical Configuration Audit (PCA) shall be required prior to acceptance by the government. 2.Initial drawings, if applicable, to include top level assembly, schematics, and corresponding parts lists to be made available to the government for review. 3.Preliminary drawings will be required for review prior to FCA/PCA. 4.One prototype assembly will be required for FCA/PCA 5.Operator’s manual or instructions required for use of the fixture and updating government technical manuals. Instructions in either Adobe PDF format or Word Document are acceptable. Specification 1.Fixture must be capable of discharging the M81757/18-1 battery cells to 0.0 volts in less than sixteen hours. 2.Fixture posts or pins must fit both M81757/18-1 battery cell lay-outs as depicted in MIL-PRF-81757/18(AS) and / or T.O. 8D2-28-2. 3.Fixture must fasten to battery utilizing the batteries four latches. 4.Fixture must have a carrying handle. 5.Fixture must be properly marked with an Identification Plate consisting of part number, serial numbers and UID, as applicable. 6.Utilization of best commercial practices.
 
Web Link
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=fcb725b1efbb9212cf5a3102b90e78be&tab=core&_cview=1)
 
Place of Performance
Address: Strategic Communication Wing One., 7891 Mercury Rd., Bldg 825, Tinker AFB, OK, Oklahoma City, Oklahoma, 73145, United States
Zip Code: 73145
 
Record
SN01702870-W 20081112/081110214438-fcb725b1efbb9212cf5a3102b90e78be (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.