SOURCES SOUGHT
Y -- Battle Creek Salmon and Steelhead Restoration Project - Eagle Canyon Canal Pipeline
- Notice Date
- 11/13/2008
- Notice Type
- Sources Sought
- Contracting Office
- Bureau of Reclamation - Mid-Pacific Regional Office 2800 Cottage Way, Room E-1815 Sacramento CA 95825
- ZIP Code
- 95825
- Solicitation Number
- 09SQ200024
- Response Due
- 12/3/2008
- Archive Date
- 11/13/2009
- Point of Contact
- Bettye Lou Mahoney Contract Specialist 9169785570 bmahoney@mp.usbr.gov;<br />
- Small Business Set-Aside
- N/A
- Description
- This announcement is to Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone, Small Business, Veteran-Owned Small Business, and Service-Disabled Veteran-Owned Small Business concerns that may be interested in performing a contract for the Mid-Pacific Region of the Bureau of Reclamation. The work to be performed is described below. Based upon response to this announcement, the Government may determine to set this acquisition aside or proceed with an unrestricted solicitation. The applicable North American Industry Classification System (NAICS) Code is 237990 and the related small business size standard is $31M. This notice is not a request for proposal and the information presented in this announcement will not obligate the Bureau of Reclamation in any manner. The estimated cost of this project is more than $10,000,000.00. This procurement will require 100% performance and payment bonds. Interested parties should include the following information in their response: (a) Business name, address, cage code, size classification based on NAICS size standard, socioeconomic classification (i.e. HUBZone and/or 8(a)), and a point of contact; (b) A positive statement of your intention to submit an offer for this solicitation as a prime contractor; (c) Evidence of your experience performing work similar in type and scope as described above under critical contract milestones, in an environmentally sensitive area and management of multiple subcontractors. The evidence should include: contract numbers, project titles, dollar amounts and points of contacts with telephone numbers. Please do not include more than three past projects; and (d) Include attachments cataloging the company's equipment assets, personnel resources and financial resources that demonstrate company responsibility and capability to perform required work.(e) If bonding is required, also provide evidence of your bonding capacity; All interested parties are encouraged to respond to this notice, by e-mail to bmahoney@mp.usbr.gov not later than the close of business on December 3, 2008. The information provided in this announcement is all information the Government has available at this time. There are no specifications, drawings, bid packages, or source lists available. Central Contractor Registration (CCR) and Annual Representations and Certifications, as required by FAR 4.1102, apply to this procurement. Prospective contractors must be registered prior to award. Lack of registration in the CCR database will make an offeror ineligible for award. Information on CCR registration can be obtained via the Internet at http://www.ccr.gov. Information on annual Representations and Certifications can be obtained via the Internet at http://orca.bpn.gov. Project Overview ? Eagle Canyon Canal Pipeline is a component of the Battle Creek Salmon and Steelhead Restoration Project, which will restore chinook salmon and steelhead trout populations to the North and South Forks of Battle Creek. These species are known to carry catastrophic fish diseases such as the waterborne pathogen IHN (infectious haematopoietic necrosis).Eagle Canyon Canal is a series of tunnels, flumes, and canal sections conveying water from Eagle Canyon Dam on the North Fork of Battle Creek, to the Inskip Powerhouse on the South Fork of Battle Creek. Eagle Canyon Canal is a component of PG&E?s hydroelectric project and runs through private property leased by the Jeffcoat Fish Facility owned by Mt Lassen Trout Farms Incorporated to operates hatcheries based on spring fed water in the area.Eagle Canyon Canal Pipeline, constructed under this contract, will bypass Eagle Canyon Canal through the trout farm to prevent the spread of catastrophic fish diseases to trout farm waters via groundwater contamination due to canal seepage.Upon completion of work under this contract, water will be diverted through Eagle Canyon Canal Pipeline between Canal Flume # 5 and Eagle Canyon Canal Spillway #35 near Manton Road Bridge. The principle components of work for the Eagle Canyon Canal Pipeline include:Temporary construction to facilitate work including removing and controlling water during construction by constructing temporary bypass pipe, relocating pipelines, constructing temporary bridge, access road and temporary fencing; clearing and grubbing site areas; Flume Extension work consisting of excavating, constructing precast concrete flume and reinforced concrete inlet structure, including mechanical features; Pipeline excavation and placement with bedding and various manhole and blowoff structures; various road work improvements, and electrical service and control features. It is anticipated that award of the work will occur in the Spring of 2009. The performance period will extend through November 2010.
- Web Link
-
FedBizOpps Complete View
(https://www.fbo.gov/?s=opportunity&mode=form&id=fd8729c7321c79a36f2b221c98bc48b2&tab=core&_cview=1)
- Place of Performance
- Address: Within 6 miles of Manton, Tehama County, CA<br />
- Zip Code: 96059<br />
- Zip Code: 96059<br />
- Record
- SN01704022-W 20081115/081113214850-fd8729c7321c79a36f2b221c98bc48b2 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |