MODIFICATION
Y -- RECOVERY--Y--High Voltage Cable Replacement - Powerhouse - Thurman Dam
- Notice Date
- 2/4/2010
- Notice Type
- Modification/Amendment
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- US Army Corps of Engineers, Savannah, P.O. Box 889, Savannah, GA 31402-0889
- ZIP Code
- 31402-0889
- Solicitation Number
- W912HN-07-D-0032-OPSH-09-11
- Response Due
- 7/2/2010
- Archive Date
- 8/31/2010
- Point of Contact
- Tisha Fitch, Phone: 912-652-5075, Monteene C. Wampler, Phone: 912-652-5504
- E-Mail Address
-
tisha.m.fitch@usace.army.mil, Monteene.C.Wampler@usace.army.mil
(tisha.m.fitch@usace.army.mil, Monteene.C.Wampler@usace.army.mil)
- Small Business Set-Aside
- Competitive 8(a)
- Description
- Design & Acquisition Delays Due to design and acquisition dates, the contractor cannot complete the project as contracted (360 calendar days) and request an extension of 125 calendar days at NO cost to the Government for a total of 485 calendar days. The issues which were not anticipated, design and acquisition of materials, specifically the wire and the termination kits have increased the pre-shutdown phase of the project to 203 calendar days. The shutdown phase cannot begin until all design and parts are in place. This phase of the work is scheduled based on the assumption that the contractor can work continuously once the process has begun.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA21/W912HN-07-D-0032-OPSH-09-11/listing.html)
- Place of Performance
- Address: Powerhouse - Thurman Dam 384 Powerplant Road Clarkhill SC
- Zip Code: 29821
- Zip Code: 29821
- Record
- SN02057940-W 20100206/100204235403-f1201a33394a131df404b74875e79756 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |