Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF FEBRUARY 21, 2010 FBO #3011
AWARD

M -- RECOVERY--M--Project Number 111601, Perform Slope Repairs on the Divide Cut Area, Tenn-Tom

Notice Date
2/19/2010
 
Notice Type
Award Notice
 
NAICS
561210 — Facilities Support Services
 
Contracting Office
USACE District, Mobile, P. O. Box 2288, 109 Saint Joseph Street (zip 36602), Mobile, AL 36628-0001
 
ZIP Code
36628-0001
 
Solicitation Number
W91278-10-062-ARRA
 
Archive Date
3/21/2010
 
Point of Contact
Alisa C. Murray, (251) 441-5578
 
E-Mail Address
USACE District, Mobile
(alisa.c.murray@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W91278-09-C-0020 Mod P00017
 
Award Date
2/11/2010
 
Awardee
R & D MAINTENANCE SERVICES, INC (037982410)<br> 409 N MAIN ST<br> HENNESSEY, OK 73742-1017
 
Award Amount
$2,256,812.93
 
Line Number
0019
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): R&D Maintenance Services, Inc., W91278-09-C-0020 Tennessee Tombigbee Operation and Maintenance Contract This contract action was not awarded as a fixed price type because uncertainties involved in contract performance did not permit costs to be estimated with sufficient accuracy to use any type of fixed price contract. As such, a cost-reimbursement type action was awarded (FAR 16.301-2). The contractor will repair/reline drainage structures in the Divide Cut Area of the Tenn-Tom Waterway. This work is within the scope of the original contract technical provisions and may require the utilization of outside contractors with specialized equipment to complete the requirements. For this modification, the contractor will repair/replace/line approximately 41 pipes varying in lengths of 88 feet to 600 feet. This will require some debris removal and clearing around the openings of the structure to allow for pipes to be relined. The U.S. Army Corps of Engineers awarded Modification P00017 against the basic cost plus award fee contract W91278-09-C-0020. P00017 is fully funded by the American Recovery and Reinvestment Act and all clauses apply.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA01/Awards/W91278-09-C-0020 Mod P00017.html)
 
Record
SN02070299-W 20100221/100219235852-eed0612869d6b8514de0d9623bb67775 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.