SOLICITATION NOTICE
61 -- ARRA - Elect Substations 26S & 40S Switchgear Replacement Project
- Notice Date
- 3/10/2010
- Notice Type
- Presolicitation
- NAICS
- 238210
— Electrical Contractors and Other Wiring Installation Contractors
- Contracting Office
- Department of Energy, SLAC National Accelerator Lab, SLAC National Accelerator Lab, 2575 Sand Hill Road, Menlo Park, California, 94303, United States
- ZIP Code
- 94303
- Solicitation Number
- SLAC_SUB_26Sand40S
- Archive Date
- 4/9/2010
- Point of Contact
- John Azevedo, Phone: 6509262241
- E-Mail Address
-
tigger@slac.stanford.edu
(tigger@slac.stanford.edu)
- Small Business Set-Aside
- N/A
- Description
- •1.01 Scope of Work: •a. Work Scope itemized below is related in the order it is to be constructed unless otherwise instructed to the contrary by a SLAC Representative. i. Install University furnished temporary power apparatus and transfer power from Substation 40S to temporary power apparatus. Work includes several transformers, switchboard/panelboards and conduit & wire installations. ii. Remove/demolish the existing 750 kVA dual bus Substation 40S switchgear and replace with University furnished switchgear. Furnished equipment is engineered to be installed in the footprint of the removed switchgear. iii. Re-transfer previously transferred load from University furnished temporary power apparatus to newly installed University furnished Substation 40S switchgear. iv. Install University furnished temporary power apparatus and transfer power from Substation 26S to temporary power apparatus. Work includes several transformers, switchboard/panelboards and conduit & wire installations. v. Remove/demolish the existing 750 kVA dual bus Substation 26S switchgear and replace with University furnished switchgear. Furnished equipment is engineered to be installed in the footprint of the removed switchgear. vi. Re-transfer previously transferred load from University furnished temporary power apparatus to newly installed University furnished Substation 26S switchgear. Remove temporary power apparatus to SLAC storage. vii. Building #026S/40S Structural & Integrity Renovation. T he work concentrates on improving the integrity of the structures as it applies to weatherproofing. The Subcontractor shall furnish all labor, materials, tools, equipment, site trailer, toilet facilities and, incidentals necessary to perform the work indicated in these specifications. The Subcontractor shall verify all dimensions, locations and quantities in the field prior to bid. Subcontractor shall furnish all construction surveys and tests required for correct location and installation of all work once awarded the work. The Subcontractor is required to provide employees who are trained and experienced in performing the work required under the conditions existing for this project. A Project Manager shall be available to SLAC project personnel upon nominal notice. A Site Supervisor having the authority to act as a representative for the Subcontractor shall be present on site during normal working hours throughout the course of the project. The Subcontractor shall provide personal protective equipment for all Subcontractor personnel onsite, including steel toed footwear, hard hats, safety glasses, work gloves and reflective vests. CONSTRUCTION SCHEDULE •a. Substation 40S - Completion by 12/2010 •b. Substation 26S - Completion by 06/2011
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/SLAC/STAN/SLAC_SUB_26Sand40S/listing.html)
- Place of Performance
- Address: 2575 Sand Hill Road, Menlo Park, California, 94025, United States
- Zip Code: 94025
- Zip Code: 94025
- Record
- SN02087725-W 20100312/100310234544-9e795ee862d26950e09890bd0444bca0 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |