SOLICITATION NOTICE
56 -- SDC Sprung Structure Concrete Slab - Solicitation
- Notice Date
- 4/1/2010
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 238110
— Poured Concrete Foundation and Structure Contractors
- Contracting Office
- Department of the Army, U. S. Army Materiel Command, Anniston Chemical Agent Disposal Facility (ANCDF), 3580 MORRISVILLE ROAD, Anniston, Alabama, 36201, United States
- ZIP Code
- 36201
- Solicitation Number
- ANCDF-IFB-W10-1325
- Archive Date
- 5/14/2010
- Point of Contact
- John Danielson, Phone: 256-238-0721 x 183
- E-Mail Address
-
john.danielson@wancdf.com
(john.danielson@wancdf.com)
- Small Business Set-Aside
- Total Small Business
- Description
- Solicitation - SDC Sprung Structure Concrete Slab PURPOSE OF PROCUREMENT Westinghouse Anniston (WA) is soliciting bids to install the concrete foundation, grounding grid, and five (5) ancillary pads necessary to construct the Static Detonation Chamber (SDC) at the Anniston Chemical Agent Disposal Facility (ANCDF). WA reserves the right not to issue an award after bid opening. MAGNITUDE OF CONSTRUCTION The magnitude of construction for this solicitation is between $500,000 and $1,000,000. SUBCONTRACT NUMBER The subcontract number assigned to this solicitation is WA-FY10-JD-522 and must be added to the Description section of your liability insurance certificate. STATEMENT OF WORK Provide all materials and labor to install a nominal 70' x 100' concrete foundation and related external equipment pads as defined in the attached Engineering Work Package (AN-1715P-SDC) and attached drawings. Contractor shall provide certified Geotechnical Engineer, Quality Control Personnel, Independent Testing and Inspection Firm, and craftsmen to complete the scope of work and validate construction. Contractor shall coordinate and plan all construction activities with URS (Westinghouse) and any sub-tier contractors as necessary to provide the concrete placement, as defined in these documents. All work shall be in compliance with applicable codes, standards and directives. Contractor shall provide materials and labor to install building grounding grid and ensure grounding embeds are in place. General: Prior to acceptance work shall be inspected to ensure that a complete installation has been provided and that the identified signals and communications intended have been implemented.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/d22ccc07bedd0bed76f1fb1614cee4d5)
- Place of Performance
- Address: 3580 Morrisville Road, Anniston, Alabama, 36202, United States
- Zip Code: 36202
- Zip Code: 36202
- Record
- SN02110121-W 20100403/100401235506-d22ccc07bedd0bed76f1fb1614cee4d5 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |