Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 04, 2010 FBO #3053
SOLICITATION NOTICE

56 -- Fence materials for Voyageurs National Park

Notice Date
4/2/2010
 
Notice Type
Presolicitation
 
Contracting Office
MWR - MWRO - Ohio MABO National Park Service415 Washington Avenue Bayfield WI 54814
 
ZIP Code
54814
 
Solicitation Number
Q6820100207
 
Response Due
4/16/2010
 
Archive Date
4/2/2011
 
Point of Contact
Linda Gordon Purchasing Agent 7157793398104 linda_gordon@nps.gov;
 
E-Mail Address
Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
(EC_helpdesk@NBC.GOV)
 
Small Business Set-Aside
Total Small Business
 
Description
This is a pre-solicitation announcement only. To request the full solicitation package, email Linda_Gordon@nps.gov Provide the materials for Ellsworth Fence, as follows and as per the Drawing attached to the Solicitation. The contractor shall perform the following tasks:1. Fabricate 26 posts of southern yellow pine (or northern red pine), 5 " - 6" diameter x 8' with domed top and mortise on each side. (See #1 on construction drawing and original post) 2. Fabricate 2 posts of southern yellow pine (or northern red pine ), 5 " - 6" diameter with domed top and mortise one side only (See #2 on construction drawing and original post) 3. Fabricate 2 gate posts of southern yellow pine (or northern red pine), 5 " - 6" diameter x 9'-6" with domed end. (See #3 on construction drawing and original post) 4. Fabricate 4 braces for gate posts of southern yellow pine(or northern red pine), 4" diameter x 3' unfinished (See #4 on construction drawing and original post) 5. Fabricate 2 cross pieces of southern yellow pine (or northern red pine), 5" diameter x 4' with domed ends and shaped to fit the flat or slightly beveled post top. (See #5 on construction drawings and original) 6. Fabricate 1 gate head of southern yellow pine (or northern red pine), 6" diameter x7', slightly bowed per historic photos; with domed ends 7. Dry-fit/preassemble 2 gate post assemblies (gate post, brace, cross unit, and gate head) to ensure that all pieces fit together well. Label parts on an inconspicuous surface for Government reassembly on site. (See gate post elevation and original components for assembly details) 8. Rough-saw 26 rails of southern yellow pine (or northern red pine), 1 " x 6" x 8' 9. Deliver fabricated pieces to Voyageurs National Park headquarters by July 19, 2010. Materials Standards 1. All timber in contact with soil shall be Micro-Pro pressure treated 2. All timbers shall be peeled of bark with draw knife finish 3. Match post dome and mortise details to sample provided by the Government The Statement of Work attached to the solicitation is provided to the Contractor as background information on the project only; Contractor to supply material only; Government will do all installation. This contract is set aside for small business concerns only. All contractors must be registered in the Central Contractor Registration (CCR) at www.ccr.gov and in the On Line Representations and Certifications (ORCA) at https://orca.bpn.gov. All questions regarding this solicitation shall b emailed to Linda_Gordon@nps.gov. No phone calls please.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/NPS/APC-IS/Q6820100207/listing.html)
 
Place of Performance
Address: Voyageurs National Park3131 Highway 53International Falls, MN 56649
Zip Code: 566498904
 
Record
SN02111277-W 20100404/100402235034-b99caa57aa0b41b5d43036b3579eccf2 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.