AWARD

M -- RECOVERY--M--PROJECT NUMBER 1680, Black Warrior and Tombigbee Rivers, AL Repair and Pave the Access Road in Service Park Area, Operation and Maintenance of Government-Owned Facilities and Equipment, BWT/Alabama Coosa Project, Tuscaloosa, Alabama

Notice Date
4/17/2010
 
Notice Type
Award Notice
 
NAICS
561210 — Facilities Support Services
 
Contracting Office
USACE District, Mobile, P. O. Box 2288, 109 Saint Joseph Street (zip 36602), Mobile, AL 36628-0001
 
ZIP Code
36628-0001
 
Solicitation Number
W91278-10-154-ARRA
 
Archive Date
6/14/2010
 
Point of Contact
Helene Mitchell, 2514416531
 
E-Mail Address
USACE District, Mobile
(helene.s.mitchell@sam.usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W91278-06-C-0038, P00100
 
Award Date
4/15/2010
 
Awardee
R & D MAINTENANCE SERVICES, INC. (037982410)<br> 409 N MAIN ST<br> HENNESSEY, OK 73742-1017
 
Award Amount
$303,539.79
 
Line Number
0041-0042
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): R&D Maintenance Services, Inc., W91278-06-C-0038 This contract action was not awarded as a fixed price type because uncertainties involved in contract performance did not permit costs to be estimated with sufficient accuracy to use any type of fixed price contract. As such, a cost-reimbursement type action was awarded (FAR 16.301-2). Furthermore, the existing contract must be used because: 1) The contractor is already responsible for the complete inspection, maintenance, and repair of this recreation area. Also, the contractor is already working in the area renovating the entrance to the park and re-aligning a portion of the access road. 2) A detailed scope of work can not be prepared. The extent of the work and the resources needed cannot be fully determined prior to removing a large culvert that must be replaced and due to the currently ongoing road re-alignment work. 3) This contract enables repairs to begin immediately after and even during the other ongoing work without a detailed scope of work so as to minimize the time the area is closed thus minimizing the impact on the public. 4) The scheduling, coordination, quality assurance and/or subcontracting for the work to be performed are within the scope of the original contract technical provisions and must be accomplished under the terms of the existing contract. The incumbent contractor not only has the management, technical, and administrative skills to efficiently and effectively accomplish this work at a reasonable cost, but also the advantage of the flexibility to readily adjust to any unforeseen obstacles encountered during installation.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA01/W91278-10-154-ARRA/listing.html)
 
Record
SN02125142-W 20100419/100417233025-82946d92a65246b823511c928fb93f85 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.