AWARD
Z -- RECOVERY--Z--PROJECT NUMBER 8530, John Redmond Dam and Reservoir, KS
- Notice Date
- 4/23/2010
- Notice Type
- Award Notice
- NAICS
- 238190
— Other Foundation, Structure, and Building Exterior Contractors
- Contracting Office
- USACE District, Tulsa, ATTN: CESWT-CT, 1645 South 101st East Avenue, Tulsa, OK 74128-4609
- ZIP Code
- 74128-4609
- Solicitation Number
- W912BV-09-R-1014
- Archive Date
- 5/23/2010
- Point of Contact
- Phyllis O. Jordan, 918 832-4120
- E-Mail Address
-
USACE District, Tulsa
(phyllis.jordan@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912BV-09-C-1013, P00003
- Award Date
- 4/23/2010
- Awardee
- HARTMAN-WALSH CORPORATION (008908568)<br> 7144 N MARKET ST<br> SAINT LOUIS, MO 63133-1899
- Award Amount
- $398,774.00
- Line Number
- 1
- Description
- RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Hartman Walsh Painting Co, W912BV-09-C-1013 As part of Operation and Maintenance, Army, Recovery Act, modification has been issued to Hartman Walsh Painting Co for Quantity Adjustment for Gates 10 and 12. The purpose of this modification is: Gate 10: Work for Gate 10 to include all items stated in Section 010000 of the original contract for gates 1-9 and 13-14. Work will include, but not be limited to, rehabilitation, sandblasting, and painting of tainter gates and trunnion anchorages and repairing of corrosion areas over 1/8-inch deep by weld build-up and under 1/8-inch deep by filling with epoxy filler material, reblasting of surfaces affected by weld build-up, attaching new cable anode, rehab side rollers, rehab hitch assemblies, remove and replace anodes on tainter gates, drill drain holes in existing stiffeners. Materials provided by the Government for use on gate 10 at the Contractor's option include: side and bottom seal assemblies, fasteners, isolation washers, 2 new hitch block pins, 4 new side roller pins and anodes. Gate 12: Work for Gate 12 to include sandblasting and painting of tainter gates and trunnion anchorages and repairing of corrosion areas over 1/8-inch deep by weld build-up and under 1/8-inch deep by filling with epoxy filler material, reblasting of surfaces affected by weld build-up, attaching new cable anode, replacing bushings, rehab side rollers, rehab hitch assemblies, remove and replace anodes on tainter gates.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/Awards/W912BV-09-C-1013, P00003.html)
- Record
- SN02130628-W 20100425/100423235157-ba1fa7804a87d6cdbace2809f6f79e75 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |