Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 25, 2010 FBO #3074
AWARD

Z -- RECOVERY--Z--PROJECT NUMBER 8530, John Redmond Dam and Reservoir, KS

Notice Date
4/23/2010
 
Notice Type
Award Notice
 
NAICS
238190 — Other Foundation, Structure, and Building Exterior Contractors
 
Contracting Office
USACE District, Tulsa, ATTN: CESWT-CT, 1645 South 101st East Avenue, Tulsa, OK 74128-4609
 
ZIP Code
74128-4609
 
Solicitation Number
W912BV-09-R-1014
 
Archive Date
5/23/2010
 
Point of Contact
Phyllis O. Jordan, 918 832-4120
 
E-Mail Address
USACE District, Tulsa
(phyllis.jordan@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912BV-09-C-1013, P00003
 
Award Date
4/23/2010
 
Awardee
HARTMAN-WALSH CORPORATION (008908568)<br> 7144 N MARKET ST<br> SAINT LOUIS, MO 63133-1899
 
Award Amount
$398,774.00
 
Line Number
1
 
Description
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Hartman Walsh Painting Co, W912BV-09-C-1013 As part of Operation and Maintenance, Army, Recovery Act, modification has been issued to Hartman Walsh Painting Co for Quantity Adjustment for Gates 10 and 12. The purpose of this modification is: Gate 10: Work for Gate 10 to include all items stated in Section 010000 of the original contract for gates 1-9 and 13-14. Work will include, but not be limited to, rehabilitation, sandblasting, and painting of tainter gates and trunnion anchorages and repairing of corrosion areas over 1/8-inch deep by weld build-up and under 1/8-inch deep by filling with epoxy filler material, reblasting of surfaces affected by weld build-up, attaching new cable anode, rehab side rollers, rehab hitch assemblies, remove and replace anodes on tainter gates, drill drain holes in existing stiffeners. Materials provided by the Government for use on gate 10 at the Contractor's option include: side and bottom seal assemblies, fasteners, isolation washers, 2 new hitch block pins, 4 new side roller pins and anodes. Gate 12: Work for Gate 12 to include sandblasting and painting of tainter gates and trunnion anchorages and repairing of corrosion areas over 1/8-inch deep by weld build-up and under 1/8-inch deep by filling with epoxy filler material, reblasting of surfaces affected by weld build-up, attaching new cable anode, replacing bushings, rehab side rollers, rehab hitch assemblies, remove and replace anodes on tainter gates.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/Awards/W912BV-09-C-1013, P00003.html)
 
Record
SN02130628-W 20100425/100423235157-ba1fa7804a87d6cdbace2809f6f79e75 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |