AWARD
Y -- RECOVERY--Y--PROJECT NUMBER 13818, Illinois River Basin Restoration , IL
- Notice Date
- 6/4/2010
- Notice Type
- Award Notice
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- USACE District, Rock Island, P.O. Box 2004, Clock Tower Building, Attn: CEMVR-CT, Rock Island, IL 61204-2004
- ZIP Code
- 61204-2004
- Solicitation Number
- W912EK-10-R-0029
- Archive Date
- 7/4/2010
- Point of Contact
- Brunson Grothus, (309)794-5241
- E-Mail Address
-
USACE District, Rock Island
(brunson.e.grothus@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912EK-10-C-0069 Mod P00002
- Award Date
- 6/4/2010
- Awardee
- MIDWEST FOUNDATION CORPORATION (050936475)<br> 22260 ILLINOIS RTE 9<br> TREMONT, IL 61568-1207
- Award Amount
- $832,800.00
- Line Number
- 0001-0002
- Description
- RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Midwest Foundation Corporation, W912EK-10-C-0069, Illinois River Basin Restoration Contract Award Amount equals $555,146.61 Recovery Funds, and $277,653.39 Non-Recovery Funds. Options E and G were exercised under Contract W912EK-10-C-0069 Mod P00002. Channels and backwaters areas of the Illinois River will be dredged using a high solids mechanical dredging methodology to varying depths. The dredged material will be placed inside of three rows of existing geotextile containers to construct an island. An additional row of geotextile containers will be placed on top of the existing geotextile containers and will be filled with dredged material using a high solids mechanical dredging methodology. Riprap will be placed to construct two rock closure structures and seventeen jetties adjacent to the island. During excavation, the contractor should expect to encounter debris such as trees, stumps, snags, metallic scrap, boat parts, tires, rope, cable, and other items that are commonly found in backwater areas of the Illinois River. The Contractor will separate and remove debris from the work site. Access from the navigation channel may be available by a previously dredged channel; however, the Contractor shall verify access requirements. All movement of floating plants may be restricted by shallow water. Peoria Riverfront Development, Illinois (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project, Stage II, Illinois Waterway, River Miles 165.5 166.0, Tazewell County, Illinois.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA25/Awards/W912EK-10-C-0069 Mod P00002.html)
- Record
- SN02168382-W 20100606/100604234445-4be8bfa2dea472ad669d812f0c64da65 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |