Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 12, 2010 FBO #3122
SOLICITATION NOTICE

Y -- CUSTER NATIONAL FOREST- Picket Pin Bridge and Retaining Wall

Notice Date
6/10/2010
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-1 East Side Acquisition Team: Beaverhead-Deerlodge; Custer; Helena; Gallatin; Lewis & Clark NFs; Dakota Prairie NG, Montana, United States
 
ZIP Code
00000
 
Solicitation Number
AG-0355-S-10-0015
 
Point of Contact
Paul Larsen, Phone: 406-287-3223
 
E-Mail Address
pclarsen@fs.fed.us
(pclarsen@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Description
Bridge - The project consists of the construction of a new concrete bridge on Forest Service Road No. 2140, milepost 6.9, at the Picket Pin Creek stream crossing. This project involves the removal of three existing 4’ diameter by 49’ long culverts and the construction of a new 40’ span by 16’ wide precast concrete bridge structure. Improvements consist of, but are not limited to; dewatering the stream channel, structural excavation, placement of riprap, erosion control measures, installation of concrete foundation and wingwalls, installation of prestressed concrete beams, temporary traffic bypass, drainage culverts, embankment and construction of the roadway approaches, and road surfacing. Retaining Wall - The project consists of the construction of a new retaining wall on Forest Service Road No. 2140, at milepost 12.2. The project involves the removal of an existing timber retaining wall and the construction of a new retaining wall consisting of timber lagging and steel piles. Improvements consist of, but are not limited to; structure excavation, structural backfill, steel H-Piles, rock bolts and treated timber lagging. The Government's estimated magnitude is between $100,000 and $250,000. The Solicitation documents should be available around June 25th.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/398/AG-0355-S-10-0015/listing.html)
 
Place of Performance
Address: The project is located in the Beartooth Ranger District of the Custer National Forest, approximately 11 miles southwest of Nye in Sweet Grass County, Montana., Bridge: The new concrete bridge is located on Forest Service Road No. 2140, milepost 6.9, at the Picket Pin Creek stream crossing., Retaining Wall: The retaining wall is located on Forest Service Road No. 2140, at milepost 12.2., Montana, United States
 
Record
SN02174061-W 20100612/100610235038-50a241e92c4397e0ec924cac10672171 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.