SOLICITATION NOTICE
Y -- CUSTER NATIONAL FOREST- Picket Pin Bridge and Retaining Wall
- Notice Date
- 6/10/2010
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-1 East Side Acquisition Team: Beaverhead-Deerlodge; Custer; Helena; Gallatin; Lewis & Clark NFs; Dakota Prairie NG, Montana, United States
- ZIP Code
- 00000
- Solicitation Number
- AG-0355-S-10-0015
- Point of Contact
- Paul Larsen, Phone: 406-287-3223
- E-Mail Address
-
pclarsen@fs.fed.us
(pclarsen@fs.fed.us)
- Small Business Set-Aside
- N/A
- Description
- Bridge - The project consists of the construction of a new concrete bridge on Forest Service Road No. 2140, milepost 6.9, at the Picket Pin Creek stream crossing. This project involves the removal of three existing 4’ diameter by 49’ long culverts and the construction of a new 40’ span by 16’ wide precast concrete bridge structure. Improvements consist of, but are not limited to; dewatering the stream channel, structural excavation, placement of riprap, erosion control measures, installation of concrete foundation and wingwalls, installation of prestressed concrete beams, temporary traffic bypass, drainage culverts, embankment and construction of the roadway approaches, and road surfacing. Retaining Wall - The project consists of the construction of a new retaining wall on Forest Service Road No. 2140, at milepost 12.2. The project involves the removal of an existing timber retaining wall and the construction of a new retaining wall consisting of timber lagging and steel piles. Improvements consist of, but are not limited to; structure excavation, structural backfill, steel H-Piles, rock bolts and treated timber lagging. The Government's estimated magnitude is between $100,000 and $250,000. The Solicitation documents should be available around June 25th.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/398/AG-0355-S-10-0015/listing.html)
- Place of Performance
- Address: The project is located in the Beartooth Ranger District of the Custer National Forest, approximately 11 miles southwest of Nye in Sweet Grass County, Montana., Bridge: The new concrete bridge is located on Forest Service Road No. 2140, milepost 6.9, at the Picket Pin Creek stream crossing., Retaining Wall: The retaining wall is located on Forest Service Road No. 2140, at milepost 12.2., Montana, United States
- Record
- SN02174061-W 20100612/100610235038-50a241e92c4397e0ec924cac10672171 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |