Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 14, 2010 FBO #3154
AWARD

Y -- RECOVERY--Y--PROJECT NUMBER ST09-1934, TAS 17 1805 TAS RECOVERY PROJECT ST09-1934::RP# REPAIR MAIN RUNWAY 8/26, NAVAL AIR FACILITY EL CENTRO, CA

Notice Date
7/12/2010
 
Notice Type
Award Notice
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
N62473 NAVFAC SOUTHWEST, DESERT IPT CODE ROPDA 1220 Pacific Highway San Diego, CA
 
ZIP Code
00000
 
Solicitation Number
N6247308D8621X005
 
Response Due
6/2/2010
 
Archive Date
8/3/2010
 
Point of Contact
Contract Specialist: Steven Miliner 619) 532-3575Contract Specialist (Alternate): Anthony Melicharek (619) 532-4569Contracting Officer: (619) 532-1301
 
E-Mail Address
steven.miliner@navy.mil
(steven.miliner@navy.mil)
 
Small Business Set-Aside
N/A
 
Award Number
N62473-09-D-1606-0004
 
Award Date
7/9/2010
 
Awardee
Reyes Construction Incorporated (DUNS 152839015)1383 S Signal DrivePomona, CA 91766-5463
 
Award Amount
$13,968,450.00
 
Line Number
0001
 
Description
THIS OPPORTUNITY WAS MADE AVAILABLE TO CONTRACTOR(S) UNDER: CONTRACT N6247308D8621, IDIQ MACC FOR AIRFIELD PAVING AND HEAVY DUTY PAVING FOR MILITARY OPERATION VEHICLES AT VARIOUS LOCATIONS WITHIN THE SOUTHWEST DIVISION AREA OF RESPONSIBILITY INCLUDING BUT NOT LIMITED TO ARIZONA, CALIFORNIA, NEW MEXICO, UTAH, NEVADA, AND COLORADO. THE FIVE (5) CONTRACTORS LISTED ON THE MACC ARE BALDI BROS., INC., CONTRACT NUMBER N62473-09-D-1603, (951) 845-9521; HAL HAYS CONSTRUCTION, INC., CONTRACT NUMBER N62473-09-D-1604, (951) 788-0703; PAVE-TECH, INC., CONTRACT NUMBER N62473-09-D-1605, (760) 729-7592; REYES CONSTRUCTION, INC., CONTRACT NUMBER N62473-09-D-1606, (909) 622-2259; AND SUNDT CONSTRUCTION, INC., CONTRACT NUMBER N62473-09-D-1607, (480) 293-3270. TAS::17 1805::TAS RECOVERYPROJECT#::ST09-1934::RP# REPAIR MAIN RUNWAY 8/26, NAVAL AIR FACILITY EL CENTRO, CA Summary of Project Scope: This design-build construction task order is to obtain all services, labor, materials, and equipment necessary for airfield pavement repairs. The work includes demolition, removal, and disposal of Portland cement concrete (PCC) and asphalt concrete (AC) pavements; preparation of existing base material and placement treated base material; placement of Portland cement concrete and asphalt concrete pavements; preparation and repair of Portland cement concrete panels, spalls, joints, and sealant; and all incidental related work. The project includes a base bid as well as three bid options. The duration of the project is 405 calendar days inclusive of 15 calendar days for submission of performance and payment bonds from date of award.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N68711AB/N6247308D8621X005/listing.html)
 
Record
SN02202806-W 20100714/100712234916-caff87816a5917d49078427dda65679d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.