Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF AUGUST 13, 2010 FBO #3184
SOLICITATION NOTICE

Z -- Upper Molina Powerplant Penstock Coupling Removal and Reinstallation for Penstock Inspection.

Notice Date
8/11/2010
 
Notice Type
Presolicitation
 
Contracting Office
Bureau of Reclamation - UC - FG 5995 Flaming Gorge Visitor Center Dutch John UT 84023
 
ZIP Code
84023
 
Solicitation Number
R10PS4P302
 
Response Due
8/18/2010
 
Archive Date
8/11/2011
 
Point of Contact
Jenny Handy Purchasing Agent 4358853228 jhandy@usbr.gov;
 
E-Mail Address
Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
(EC_helpdesk@NBC.GOV)
 
Small Business Set-Aside
N/A
 
Description
The principal components of the work to be performed under these specifications includes the equipment and labor required to remove four 30-inch diameter dresser couplings, two 30-inch diameter x 36-inch long carbon steel sections of penstock located in concrete access structures to allow for penstock inspection by USBR Inspectors. Penstock inspection will last for approximately three days. Once the inspections have been completed, the four couplings and two 36-inch long sections of penstock will be reinstalled with existing bolts and nuts, using Government furnished gaskets, prepping and recoating the four couplings and the 30-inch diameter penstock exposed in the two underground structures with Government furnished coal-tar and penstock primer. The work will also include utilizing a D6 bulldozer, or equivalent, to provide access road cleanup as necessary to allow ready access for equipment to all the Upper Molina Penstock access structures above the two access structures where penstock sections will be removed and replaced. It is expected access road cleanup can be accomplished with a single pass of a bulldozer starting at the top of the access road, and proceeding down to where the two access structures are located. The Government intends to award on a firm fixed priced contract. The request for quotes will be issued August 11, 2010. The request for quotes and admendments will be available online. Interested vendors can download the request for quotes via the Federal Business Opportunities (FBO) website (www.fbo.gov). The due date for the quotes is August 18, 2010 with work to be started on August 23, 2010. We have a limitedl window of time the Contractor has to be able to start work on the 23 rd of August and have completed by the 27th of August. Prospective vendors must register in CCR prior to the award of a contract. Information on Central Contractor Registration Handbook, and the registration process can be obtained via the CCR web site: http://www.ccr.gov or by calling 1-888-227-2423.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/900aed8c02ede930c6957df434e7d50b)
 
Place of Performance
Address: The work is located on the Upper Molina penstock approximately 7 miles South East of Molina, Colorado.
Zip Code: 81646
 
Record
SN02236882-W 20100813/100811235503-900aed8c02ede930c6957df434e7d50b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.