Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 09, 2011 FBO #3392
MODIFICATION

46 -- The goal of this project is to acquire and analyze real-time water quality and quantity data and weather data at four sited in the following areas of the Middle East region, Israel, the Palestinian Territories, and Jordan.

Notice Date
3/7/2011
 
Notice Type
Modification/Amendment
 
Contracting Office
NBC - Acquisition Services Directorate 381 Elden Street, Suite 4000 Herndon VA 20170
 
ZIP Code
20170
 
Solicitation Number
D11PS18897
 
Response Due
3/16/2011
 
Archive Date
3/6/2012
 
Point of Contact
Michael McGuire Contract Specialist 7039643622 mike.mcguire@aqd.nbc.gov;
 
E-Mail Address
Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
(EC_helpdesk@NBC.GOV)
 
Small Business Set-Aside
Total Small Business
 
Description
Amendment 5 - contractor questions and government respose are posted at AQD website http://www.aqd.nbc.gov/ (and select Business Community, Solicitations, Open Market Solicitations) or copy and paste the following link:http://www.aqd.nbc.gov/Business/openmarket.aspx 1). Do any of the sites have pumps installed on the wells? Response: No. Of the four sites, none have pumps installed. 2). If the wells have pumps installed, then we will need to use a flow cell system which requires installing a tap connected to the pump water line. We prefer that the user(customer) perform the modification. Response: N/A 3). If the well has pumps connected to them, can one throw a pressure transducer down the well (is there an opening, or is the well completely enclosed)? Response: N/A 4). What is the diameter of the well? Response: Wells will accept 3 inch O.D. probes 5). Is Measuring Phosphate required? Response: No. However, we request a price quote for hand-held units that can measure phosphate. 6). How deep is the well (depth to water), this will help us add an appropriate length of cable. Response: Well depth is ~70m and ~50m to groundwater. 7). We are proposing to supply a 3 meter tower, which needs a simple concrete foundation. Can we have the end use (in each country) perform the civil Response: Concrete foundations already exist at each site. 8). For how long must the supplier host the data? Response: Data may be hosted for 1 year.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/0bbd7164ffb435f8a81dcc2b44571c68)
 
Place of Performance
Address: All word will be performed in the Middle East Region. Specific locations include Tel Aviv, Israel, the Palestinian Territories, and Amman, Jordan.
Zip Code: 61000
 
Record
SN02394590-W 20110309/110307234144-0bbd7164ffb435f8a81dcc2b44571c68 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.