Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 17, 2011 FBO #3400
SOURCES SOUGHT

96 -- TITANIUM SLURRY, SECONDARY/INTERMEDIATE SLURRY and/or FINAL/BACKUP SLURRY

Notice Date
3/15/2011
 
Notice Type
Sources Sought
 
NAICS
331528 — Other Nonferrous Foundries (except Die-Casting)
 
Contracting Office
Joint Manufacturing & Technology Center (TACOM-CC), Rodman Avenue Bldg 210, 1 Rock Island Arsenal, Rock Island, IL 61299-5000
 
ZIP Code
61299-5000
 
Solicitation Number
W9098S11TRBO1
 
Response Due
4/12/2011
 
Archive Date
6/11/2011
 
Point of Contact
Reuben B. Orris, 309-782-8513
 
E-Mail Address
Joint Manufacturing & Technology Center (TACOM-CC)
(reuben.b.orris@us.army.mil)
 
Small Business Set-Aside
N/A
 
Description
The Rock Island Arsenal Joint Manufacturing and Technology Center is looking companies that sell the following products and for price and availability of the following products. Please E-Mail your information to: reuben.b.orris@us.army..mil or FAX to 309-782-6727 or 309-782-3721. TITANIUM SLURRY Primary/Facecoat Slurry: -The Contractor will provide a primary/facecoat system for use in Investment Casting shells for cast titanium. This primary/facecoat will be the first layer applied to the wax pattern and therefore, be immediately contacting the cast titanium. -The recommended primary/facecoat will be a commercially proven system that is compatible with the casting of titanium alloys. -The recommended primary/facecoat will be a non-Ethyl Silicate blend which does not require special ventilation or additional flame supression. -The primary/facecoat system will be ammonia FREE. -The recommended primary/facecoat must be formulated to minimize alpha case to levels which are typical for the titanium commercial industry. -Cost must be a factor in selecting the recommended primary/facecoat since the majority of the titanium applications to be produced at RIA-JMTC will be non-aerospace lower cost components. -Currently RIA-JMTC uses The Kindt-Collins wax system so the recommended titanium primary/facecoat must be compatible with the existing The Kindt-Collins wax system. If that is not possible the Contractor shall recommend several commercially available wax compositions that are compatible with the recommended primary/facecoat. -The Contractor will provide all ingredients and the recipe to produce a primary/facecoat slurry including but not limited to: oFlour oBinder oWetting agent oAnti-foam oAnti-bacteria -The Contractor will provide work instructions for blending and soak time for the primary/facecoat slurry and additives. -The Contractor will provide all limits for quality on the primary/facecoat slurry along with guidelines on how to keep the slurry viable. -The Contractor will also recommend test equipment for doing the quality checks. -The Contractor will also provide an estimate as to slurry pot life for cost estimating purposes Secondary/Intermediate Slurry and/or Final/Backup Slurry: Please provide option 1,2 or 3- -1. RIA-JMTC currently uses a final/backup slurry system for their aluminum and steel casting investment molds which is Colloidal Silica. The preference would be that the primary/facecoat system is compatible with our existing backup system such that RIA-JMTC can use one final/backup system for all of its investment cast products. -2. IF the primary/ facecoat shell layers used for titanium casting will be incompatible with the existing RIA-JMTC secondary/ final slurry, then the Contractor will provide a secondary/intermediate system for use in Investment Casting shells. This secondary/intermediate will adhere to both the primary/facecoat slurry and the current backup slurry coats providing the needed barrier between the primary and final coats. -3. IF the primary/ facecoat shell layers used for titanium casting will be incompatible with the existing RIA-JMTC secondary/ final slurry, then the Contractor will provide a secondary/final system for use in Investment Casting shells eliminating a 3rd slurry. -The recommended final/backup slurry system or secondary/intermediate system will be a commercially proven system that is compatible with the casting of titanium alloys. -The recommended final/backup slurry system or secondary/intermediate will be ammonia free and require no special ventilation. -The Contractor will provide all ingredients, and the recipe to produce a secondary/intermediate slurry including but not limited to: oFlour oBinder oWetting agent oAnti-foam oAnti-bacteria -The Contractor will provide work instructions for blending and soak time for the secondary slurry and additives. -The Contractor will provide all limits for quality on the secondary slurry along with guidelines on how to keep the slurry viable. -The Contractor will also recommend test equipment for doing the quality checks. -The Contractor will also provide an estimate as to slurry pot life for cost estimating purposes.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/bed1997b280fd8be03e62c2b17726c34)
 
Place of Performance
Address: Joint Manufacturing & Technology Center (TACOM-CC) Rodman Avenue Bldg 210, 1 Rock Island Arsenal Rock Island IL
Zip Code: 61299-5000
 
Record
SN02401106-W 20110317/110315234832-bed1997b280fd8be03e62c2b17726c34 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.