AWARD
Z -- RECOVERY--Z--PROJECT NUMBER 16040, Sam Rayburn Dam and Reservoir, TX, PROJECT NUMBER 79053, Town Bluff Dam, B A Steinhagen Lake, TX U.S. Army Corps of Engineers, Fort Worth District- Modification to Correct Wage Decision
- Notice Date
- 4/29/2011
- Notice Type
- Award Notice
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- USACE District, Fort Worth, PO Box 17300/819 Taylor Street, Fort Worth, TX 76102-0300
- ZIP Code
- 76102-0300
- Solicitation Number
- W912BV-08-D-2020-DY01-06
- Archive Date
- 5/29/2011
- Point of Contact
- ELIZABETH KELLEY, 817-886-1044
- E-Mail Address
-
USACE District, Fort Worth
(elizabeth.j.kelley2@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912BV-08-D-2020-DY01-06
- Award Date
- 4/28/2011
- Awardee
- ENVIRONMENTAL CHEMICAL CORPORATION (601293962) <br> 1240 BAYSHORE HGHWY<br> BURLINGAME, CA 94010-1805
- Award Amount
- $20,803.17
- Description
- RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Environmental Chemical Corporation,W912BV-08-D-2020-DY01-06-Embankment Repairs, Belton, Granger & Nav.Mills Lk This contract action was accomplished using other than competitive procedures because this is a task/delivery order where an exception to fair opportunity requirements was approved as this is a follow-on order to a competitive initial order (FAR 8.405-6(b)(2) or 16.505(b)(2)(iii). This is a special notice to inform he public of the use of the Recovery Act funds. RECOVERY: THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. CONTRACTOR: Environmental Chemical Corp., DUNS#094011991. This contract action was accomplished using a MATOC. As a part of the U.S. Army Corps of Engineers, Fort Worth District mission the contractor will provide all labor, equipment and materials to conduct earthwork, vegetation removal, rip rap removal and replacement, bedding stone replacement, erosion repair, slope repair, and as-built drawings, in order to repair the embankments and shoreline at the following Texas lakes: Granger Lake, Belton Lake, and Navarro Mills. This modification is executed to correct and fund the Davis Bacon Wage Decisions on this task order.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA63/Awards/W912BV-08-D-2020-DY01-06.html)
- Record
- SN02436723-W 20110501/110429234540-a042511dd6ca46172164aa3fafa9c1ec (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |