Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JUNE 11, 2011 FBO #3486
SOURCES SOUGHT

99 -- Moving Services

Notice Date
6/9/2011
 
Notice Type
Sources Sought
 
NAICS
484210 — Used Household and Office Goods Moving
 
Contracting Office
Department of Energy, Bechtel National, Inc. (DOE Contractor), Bechtel National Inc., 2435 Stevens Center Place, Richland, Washington, 99352
 
ZIP Code
99352
 
Solicitation Number
24590-NP-SRA-HX00-00093
 
Point of Contact
Winifred Renz, Phone: 5093712338
 
E-Mail Address
werenz@bechtel.com
(werenz@bechtel.com)
 
Small Business Set-Aside
N/A
 
Description
Moving Services Subcontract Requisition Number: 24590-NP-SRA-HX00-00093 Submit Interest By: June 29, 2011 Estimated Budget: < $500,000.00 Schedule: •· Issue Request for Proposal: July 2011 •· Award and Notice to Proceed: September 2011 •· Start Work: October 2011 •· All Work Complete: September 2016 Safety Classification: NON-ITS Additional Characteristic: NONE Quality Level: CM Type of Subcontract: IDIQ UTILIZING FIRM FIXED PRICE PROJECT DESCRIPTION AND LOCATION The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a complex of radioactive waste treatment processing facilities designed and constructed by Bechtel National, Inc. for the Department of Energy (DOE). The facility will process the Hanford Site tank waste and convert the waste into a stable glass form. The Project site is located in the 200 East Area of the Hanford Reservation near Richland, Washington, along the Columbia River. The site elevation varies from 662 to 684 feet above mean sea level. Ambient temperature range is -23 degrees F minimum to 113 degrees F maximum, with relative humidity of 5% minimum to 100% maximum. The project design life is 40 years. SCOPE OF WORK SUBCONTRACTOR shall provide all necessary expertise, manpower, material, moving apparatus/equipment and moving vehicles to relocate personnel, equipment, and supplies throughout the WTP Richland Campus and WTP Construction Site, as required by CONTRACTOR. QUALITY ASSURANCE (QA) REQUIREMENTS Programmatic Quality Assurance requirements for subcontracts performed in the WTP Jobsite will be "NP" (non permanent or temporary work, generally no QA Program required), "CM" (commercial quality based the requirements in DOE Order 414.1C), or "QL" (nuclear level quality based on the requirements in ASME NQA-1 2000). Bechtel may require, as an element of bidder pre-qualification, submission of a representative sample QA Program or Table of Contents copy. For QL subcontracts, the successful bidder's QA Program must be approved prior to award of the subcontract. BIDDER REGISTRATION AND PRE-QUALIFICATION Preliminary Pre-Qualification Requirements The BNI Acquisition Services Subcontracts group, is responsible for collection, evaluation, and internal publication of potential bidders' information for the purpose of pre-qualifying them to bid on any particular subcontract. As part of this process, BNI requires all potential offerors to register at the Supplier and Contractor Portal at: https://supplier.bechtel.com Prior to being considered for bidding on a Request For Proposal (RFP) for this WTP web posting opportunity, potential bidders must complete and submit the required forms located at http://www.hanfordvitplant.com/supplier_resources/qualification_process/ All information provided shall be strictly confidential. Registration All bidders must register with Bechtel National, Inc. for Work on the WTP Project. If your company has registered previously, then only supplemental information should be sent to the Bechtel National, Inc. representative noted below. Information to be provided by potential bidders must include: •· Dun and Bradstreet #: •· Company Name: •· Company Address: •· Contact Phone #: •· Contact Fax #: •· Contact Person: •· E-mail Address: •· Safety data and information •· Applicable work experience and Projects WTP BACKGROUND Information about the WTP Project can be found on http://www.hanfordvitplant.com CONTACT Bechtel National, Inc. 2435 Stevens Center Place Richland, WA 99354 Attn: Deborah Mackay Tel. No. 509.371.2160 Email address: dsmith@bechtel.com Mailstop: MS14-3A
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/BNI/BNI/24590-NP-SRA-HX00-00093/listing.html)
 
Place of Performance
Address: The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is a complex of radioactive waste treatment processing facilities designed and constructed by Bechtel National, Inc. for the Department of Energy (DOE). The facility will process the Hanford Site tank waste and convert the waste into a stable glass form., The Project site is located in the 200 East Area of the Hanford Reservation near Richland, Washington, along the Columbia River. The site elevation varies from 662 to 684 feet above mean sea level. Ambient temperature range is -23 degrees F minimum to 113 degrees F maximum, with relative humidity of 5% minimum to 100% maximum. The project design life is 40 years., Richland, Washington, 99354, United States
Zip Code: 99354
 
Record
SN02468100-W 20110611/110609234253-7533e89b3e57a26e026d29d2bd9458db (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.