Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 06, 2011 FBO #3603
DOCUMENT

Y -- CO PFH 59-1(4), Taylor River Road - Solicitation 1

Notice Date
10/4/2011
 
Notice Type
Solicitation 1
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-11-B-00017
 
Archive Date
11/18/2011
 
Point of Contact
Jeremiah B. Rogers, Phone: 7209633090, Aaron L. Sanford, Phone: 7209633090
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Solicitation for CO PFH 59-1(4), Taylor River Road PROJECT DETAILS : CO PFH 59-1(4), Taylor River Road This project is located in the Gunnison National Forest and in Gunnison County Colorado on Taylor River Road, Forest Highway 59 (County Road 742). The project crosses rolling and mountainous terrain at an approximate elevation of 2680 meters (8800 ft). This project consists of the reconstruction of approximately 8.5 km (5 miles) of Forest Highway 59, a two lane highway, beginning seven miles southeast of Almont Colorado. This project will include major grading, drainage, aggregate base, superpave hot asphalt concrete pavement, soil nail wall, rockery construction, turf establishment, and partial width traffic control. This project will require approximately 65,000 cubic meters (85,000 cubic yards) of earthwork; 59,500 tons of aggregate base; 20,700 tons of superpave hot asphalt concrete pavement; 450 square meters (540 square yards) of soil nail retaining wall; 490 square meters (580 square yards) of rockeries; 1300 meters (4300 feet) of pipe and structural plate pipe culvert installation; parking area construction, and 45 private driveways. This project is located in a challenging and highly sensitive National Forest with stretches of private property. The route is open all year with a seasonal average daily traffic count of approximately 1500 vehicles. Great attention to detail will be required in achieving customer satisfaction in areas of creative landscaping, topsoil management, rock blasting, traffic control and timely completion of work. The project consists of three schedules and one option package. It is anticipated that this project will be advertised in September, 2011 with construction beginning early November, 2011 and extending through late November, 2012. Estimated cost for the base schedule and option is $7.0 to $15.0 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-11-B-00017/listing.html)
 
Document(s)
Solicitation 1
 
File Name: Link to the CFLHD website where plans, plan holders lists, reports (geotech and earthwork) and questions/answers may be viewed or downloaded. (http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm)
Link: http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: Forest Highway 59, a two lane highway, beginning seven miles southeast of Almont, Colorado., Almont, Colorado, 81210, United States
Zip Code: 81210
 
Record
SN02601413-W 20111006/111004234242-a3b801a21935087ce770ee684c78a6c0 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.