Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF OCTOBER 16, 2011 FBO #3613
MODIFICATION

Y -- WY PRA YELL 10(16), Grand Loop Road, Canyon to Tower, Phase II

Notice Date
10/14/2011
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Western Federal Lands Highway Division, 610 East Fifth Street, Vancouver, Washington, 98661-3801
 
ZIP Code
98661-3801
 
Solicitation Number
DTFH70-11-R-00016
 
Point of Contact
Contracts G. Office, Phone: (360)619-7520
 
E-Mail Address
WFL.Contracts@dot.gov
(WFL.Contracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
10/14/11- Site Access UPDATE- The site access information found in the Prelim Letter posted on 9/23/11 has changed. Due to winter weather and staffing, viewing of the project between Canyon Junction to just south of Tower Fall will not be available after October 24, 2011. The remainder of the project may be accessible until the park closes on November 7. If winter conditions result in roadway shut-down, access to sections of the project may be stopped before October 24th. The project may be viewed Monday through Friday (was previously Monday through Sunday). The road is closed by a locked gate just north of Canyon Junction and a locked gate just south of Tower Fall (Beginning of Project). There are three areas of site work that are within the closed gate area. A majority of the project, Obsidian Creek Bridge, Canyon Village Parking Area and the road construction work between Tower Fall and Tower Junction may be accessible until the park closes on November 7. Call the Yellowstone National Park Communication Center (307-344-2640 weekdays) to schedule access to the Canyon Junction to Tower Fall area. Ask them to put you in touch with the Tower Rangers, who will coordinate access (if still possible). **** WY PRA YELL 10(16), Grand Loop Road, Canyon to Tower, Phase II, Yellowstone National Park, Park County, Wyoming This project consists of 3.78 kilometers of grading, base, drainage, retaining walls, and the removal of an existing bridge and construction of a single-span, 45-foot long steel beam timber deck bridge founded on concrete spread footings. See "Project Description" for additional details. NOTICE OF SUBCONTRACTING OPPORTUNITY WY PRA YELL 10(16), Grand Loop Road, Canyon to Tower, Phase II will be solicited to the six Yellowstone/Grand Teton MATOC contractors. Information on the MATOC contractors may be found on our web site at: http://www.wfl.fhwa.dot.gov/contracting/construction/idiq/ygt.htm This project is anticipated to be solicited Winter/Spring 2012. The work will be solicited under two alternate schedules, with different amounts of work in each schedule. One schedule will be awarded. PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. Registering at ADD TO WATCHLIST box insures notification when solicitation documents are posted. When solicitation documents are issued, the REQUEST FOR PROPOSAL ( specifications and plans ) will be posted at this link. Tentatively, work shall be completed by October 15, 2015. (Once solicitation is issued, see FAR Clause 52.211-10 for exact date.) Estimated PRICE RANGE is between $15 million and $20 million. This paragraph announces possible financing available to small businesses. The three types of businesses that are eligible to receive a loan through this program are: (1) Firms that have received DBE certification from a state or local transportation agency; (2) Eligible small business firms; and (3) Firms that have received a disability rating by the Veteran's Administration and have certified themselves as a SDVOSB. Start-up businesses are not eligible to receive a STLP line of credit and should contact the SBA for information about other possible forms of financial assistance. (NOTE - This paragraph does not reserve this solicitation for these types of business) : The Department of Transportation's (DOT) Short-Term Lending Program (STLP) offers working capital financing in the form of lines of credit to finance accounts receivable for transportation related contracts. The Maximum line of credit is $750,000. The STLP loan has a variable rate, which is connected to the prime rate. For more information see: http://osdbuweb.dot.gov/financial/index.cfm.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/WFL/DTFH70-11-R-00016 /listing.html)
 
Place of Performance
Address: PROJECT IS LOCATED within the boundaries of Yellowstone National Park, Wyoming, Yellowstone National Park, Wyoming, United States
 
Record
SN02607330-W 20111016/111014233834-841d6b96a93061c0d2ee9bd2e27a6bef (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.