SOURCES SOUGHT

Z -- Lucky Peak Intake Tower Electrical Improvements

Notice Date
2/7/2012
 
Notice Type
Sources Sought
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
USACE District, Walla Walla, 201 N. Third Avenue, Walla Walla, WA 99362-1876
 
ZIP Code
99362-1876
 
Solicitation Number
W912EF-12-R-SS16
 
Response Due
2/17/2012
 
Archive Date
4/17/2012
 
Point of Contact
Elaine M. Vandiver, 509-527-7221
 
E-Mail Address
USACE District, Walla Walla
(elaine.m.vandiver@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
The US Army Corps of Engineers, Walla Walla District is seeking small business sources for a construction project entitled: Lucky Peak Intake Tower Electrical Improvements. The work is located at the Lucky Peak Dam, Boise, Idaho. This will be a firm-fixed-price construction contract. Construction magnitude is between $100,000 and $250,000, and 100% performance and payment bonds will be required. The North American Industry Classification System (NAICS) code for this project will be 238210 and the associated small business size standard is $14,000,000. This sources-sought announcement is a tool to identify businesses with the capability to accomplish the work. This is not a solicitation. Only those firms who respond to this announcement by submitting the following information will be used in determining whether to set aside this requirement. 1) A list of current or past projects demonstrating technical experience with work of a similar nature to that listed in the Summary Scope of Work. For each project submitted, provide a brief narrative statement of the work your firm accomplished, your firm's role in the project, the dollar value and the completion date (or projected completion date). 2) A reference list for each of the projects submitted in #1 above. Include the name, title, phone number and email address. 3) Provide a statement of your firm's bonding capacity. 4) Provide a statement of your firm's business size and type (HUBZone, Service Disabled Veteran Owned, 8(a), woman-owned). 5) Cage Code and DUNS number. Submit this information to Elaine Vandiver, Contract Specialist, via email to Elaine.M.Vandiver@usace.army.mil. Your response to this notice must be received on or before 12:00PM on February 17, 2012. Summary of Scope of Work-- The work shall include but not be limited to: 1. Perform a load study and arc-fault analysis of the power system for the intake structure. 2. Locate existing conduit and wire route in the roadway from hand hole (HH) #5 and pull boxes to the abutment. 3. Disconnect #4/0 feeders spliced to #6 conductors in HH #5. Megger test #4/0 conductors to manifold building feeder circuit breaker. 4. Disconnect and remove wire and cable in conduit for feeder, signal, and control circuits routed in conduit buried in the roadway from intake tower to HH #5 and/or pull boxes. 5. Saw cut asphalt, excavate, partially demolish duct bank and trench for new handholes at the abutment and for new conduit from the abutment to HH #5. 6. Disconnect and remove existing roadway luminaire. Install new luminaire at bridge gate. 7. Install new handholes and conduit, backfill and compact trench. Connect new and existing conduit to new abutment handholes. Restore roadway surface. 8. Disconnect and pull back or remove as indicated feeder, branch circuit, signal and control circuits in the intake tower. 9. Remove existing 480 V power distribution disconnects and equipment. Remove interconnecting conduit as indicated. Remove "capsian" winch controller. 10. Install interior and exterior pull boxes, install conduit from abutment handholes to intake tower. 11. Install a new 480 V power distribution panelboard. Relocate existing power distribution equipment and equipment control panels as indicated. 12. Install new conduit to connect power distribution and controls to existing and new panelboards, existing controllers and existing conduit system. 13. Clean and mandrel all conduits. 14. Re-pull existing conductors indicated and install new conductors to reconnect all power, signal and control circuits. 15. Remove existing #4/0 conductors from HH #5 to the intake structure exterior mounted terminal/splice cabinet. Remove and replace cabinet with new NEMA 4x SS cabinet, install and connect new #4/0 conductors. 16. Remove existing intake gate pendant control equipment. Add switches and relays to the controllers to add functions to the pendant control. Provide a new flexible cable, pendant controller and cord and plug connector. Test all gate hoist operations. 17. Test all conductors and equipment operations.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA68/W912EF-12-R-SS16/listing.html)
 
Place of Performance
Address: Lucky Peak Dam 9723 East Highway 21 Boise ID
Zip Code: 83716
 
Record
SN02668963-W 20120209/120207234634-3240ffcc65684951248447d4a1333e8d (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.