Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 03, 2012 FBO #3752
MODIFICATION

66 -- HELIUM LEAK DETECTOR

Notice Date
3/1/2012
 
Notice Type
Modification/Amendment
 
NAICS
334513 — Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables
 
Contracting Office
NASA/Lyndon B. Johnson Space Center, Houston Texas, 77058-3696, Mail Code: BH
 
ZIP Code
00000
 
Solicitation Number
NNJ12425460Q
 
Response Due
3/9/2012
 
Archive Date
3/1/2013
 
Point of Contact
LaToy J. Jones, Contracting Officer, Phone 281-244-8023, Fax 281-483-4066, Email latoy.j.jones@nasa.gov - Keith D Hutto, Contracting Officer, Phone 281-483-4165, Fax 281-244-5331, Email keith.d.hutto@nasa.gov
 
E-Mail Address
LaToy J. Jones
(latoy.j.jones@nasa.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
THIS NOTICE CONSTITUTES AMENDMENT NO. 01 TO THE COMBINED SYNOPSIS/RFQ FOR HELIUMLEAK DETECTOR.Companies shall acknowledge all amendment(s) in their quote. This noticeserves as the official amendment to subject synopsis/RFQ and a written amendment will notbe issued.The purpose of this amendment is to answer the following questions below:Q1: In the Statement of Work (SOW), it states Helium Mass 4 or Mass 5, however, thetypical gasses used are H2, He3 and He4 with masses, respectively, of 2, 3, and 4.A1: This is an error. It should read Mass 3 and Mass 4. See the attached updatedStatement of Work at:http://procurement.jsc.nasa.gov/NNJ12425460Q/SOW-R.docChanges are in bold.Q2: In the SOW, it states 'Gross leak detection up to 100 Torr', is this for qualitativeor quantities use? Please describe the situations where this feature is required.A2: Gross leak detection up to 100 Torr is for qualitative use. When a suspect 'grossleaker' is undergoing testing, it's important to get it into test mode at the highestpressure possible so that the helium within the leak is still detectable.Q3: In the SOW, it states 'Direct drive roughing pump and fore line pump', does this meanoil free or rotary vane roughing pump? What is the required pumping capacity for theroughing pump?A3: The pumps shall be dual stage rotary vane. Also, the pumping capacity of the roughingpump shall be 16 cfm minimum.Q4: Please define the requirement for 'Work surface area' stated in the SOW.A4: The work surface area being used is approximately 4 square feet. A work surface isneeded to support miscellaneous tooling and fixturing used during test operations. Also,the surface is needed for easy access to data sheets and support paperwork. The due date for receipt of offers is not extended.Companies shall provide the information stated in the synopsis/RFQ posted on the NASAAcquisition Internet Service (NAIS) on February 27, 2012. Documents related to thisprocurement are available over the Internet. These documents reside on a World Wide Web(WWW) server which may be accessed using a WWW browser application. The Internet site, orURL, for the NASA/JSC Business Opportunities home page ishttp://prod.nais.nasa.gov/cgi-bin/eps/bizops.cgi?gr=D&pin=73
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/NASA/JSC/OPDC20220/NNJ12425460Q/listing.html)
 
Record
SN02687227-W 20120303/120301235507-3eca9ae31b439f60e6cc04cd9498e824 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.