Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 09, 2012 FBO #3758
MODIFICATION

56 -- 12V, 98AH non-spillable battery & 130w, 12V Solar Module

Notice Date
3/7/2012
 
Notice Type
Modification/Amendment
 
NAICS
334413 — Semiconductor and Related Device Manufacturing
 
Contracting Office
Department of Agriculture, Forest Service, WO-AQM IT Support, Albuquerque Service Center, Pan American Bldg, Suite 200, 101 B Sun Ave NE, Albuquerque, New Mexico, 87109, United States
 
ZIP Code
87109
 
Solicitation Number
AG-7604-S-12-BATTERY
 
Archive Date
3/24/2012
 
Point of Contact
James R. Jefferis, Phone: 5058423389
 
E-Mail Address
jjefferis@fs.fed.us
(jjefferis@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Questions & Answers #2 07 March 2012 Q: When do you need delivery -number of days or date? A: Per paragraph 3 of the solicitation letter, delivery is required 30 days ARO. Q: line 2 -Solar panels.. can you accept a panel with MC4 cables ? (instead of wiring conduit to juction box it has cables with MC4 connecton --this very reliable weather proof connection... most solar panels these days come with this type connection... A: Solar panels are required to be configured with junction boxes. Q: I don't see a line for racking or mounting ? If you want racking let me know what you like ie... side of pole mount, roof track mount,etc and how many panels per a mount/rack I can then suggest some... A: Not required. Q; Charge controller? -normally there is a charge controller between battery and solar panel...this regulates solar panel ie prevents battery from being overcharged... A: Not required. Q; just to verify you want 24 batteries but only 20 panels? Are some batteries spares to to replace other batteries in use? A: There is no connection between the number of batteries and number of solar panels. Q: In the description of the solar panel, it says that the junction box needs to be conduit ready. What size conduit will be used and how many panels are going to be wired together? A: We will install two to three panels in a set and use a ¾" watertight non-metallic flex conduit.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/WOAQMITS/AG-7604-S-12-BATTERY/listing.html)
 
Record
SN02690462-W 20120309/120307234602-358ef991f176cc1608c494bb214e373a (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.