Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF MARCH 22, 2012 FBO #3771
SOLICITATION NOTICE

Y -- La Sal Mountain Loop Road

Notice Date
3/20/2012
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-12-B-00003
 
Archive Date
6/30/2012
 
Point of Contact
Aaron L. Sanford, Phone: 7209633090, Jeremiah B. Rogers, Phone: 7209633090
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
This project will be advertised on a Full and Open basis (unrestricted competition). Tentative Advertisement date is April 5, 2012. No plans or project specifications will be available until that time. PROJECT DETAILS: UT PFH 46-1(2) La Sal Mountain Loop Road Location: Utah Forest Highway (FH) 46 is located in San Juan and Grand Counties in eastern Utah. The route is also designated as County Route 1704 (CR-1704) and is also known as the La Sal Mountain Loop Road. The route begins at the junction with US-191, approximately 6 miles south of Moab, UT, and proceeds east and north 36.4 miles to the junction with SR-128 in Castle Valley, UT. The four segments are located at mileposts 2 to 5.3, 12.6 to 13.3, 21.1 to 23.1, and 25.8 to 27.3. The combined length for the four segments is approximately 7.5 miles. The project consists of one schedule and two options. Significant items and quantities: Project will involve heavy resurfacing, restoration, and rehabilitation (3R) of two segments (mp 12.6 to 13.3 and 21.1 to 23.1) and typical 3R work in the two other segments. Work will include excavation, retaining walls, drainage, paving, safety improvements, survey, erosion control, permanent and temporary traffic control, and revegetation. Major approximate quantities include: •- 14,000 cuyd of Excavation •- 6,900 sqft of Mechanically Stabilized Earth Wall •- 40,000 feet of pulverizing •- 16,500 tons of HACP Pavement •- 1,350 linear feet of Culverts •- 45 linear feet of Precast 8'x5' Concrete Box Culvert •- 2,990 linear feet of underdrain system •- 2,900 linear feet of curb and gutter •- 550 linear feet of guardrail Full closures allowed for construction of Miner's Basin and Mill Creek segments. Other work will occur under short term closures with one lane closures/30 minute delays. It is anticipated that this project will be advertised in early April, 2012 with construction beginning in June and extending through November, 2012. A+B bidding by the ½ season is anticipated (still under review). Estimated cost for the base schedule and two options are $5 to $7 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-12-B-00003/listing.html)
 
Place of Performance
Address: Moab, Utah, 84532, United States
Zip Code: 84532
 
Record
SN02701391-W 20120322/120321000227-7f30423e2f4bbca4d396bd1a8f076ef6 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.