DOCUMENT
Z -- Renovations for Healthy Kitchen - Attachment
- Notice Date
- 4/4/2012
- Notice Type
- Attachment
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- Department of Veterans Affairs;Wilkes Barre VAMC;Acquisitions (049E);1111 E End Blvd;Wilkes Barre PA 18711-0030
- ZIP Code
- 18711-0030
- Solicitation Number
- VA24412B0451
- Response Due
- 4/19/2012
- Archive Date
- 7/18/2012
- Point of Contact
- Everett E Shaver
- E-Mail Address
-
824-3521
- Small Business Set-Aside
- Service-Disabled Veteran-Owned Small Business
- Description
- STATEMENT OF WORK RENOVATIONS FOR HEALTHY KITCHEN PROJECT# 200 February 2012 1.General: a.The scope of work shall generally consist of, but not necessarily be limited to, providing all labor, materials, tools, equipment, permits, testing, and reports required for the renovation to remove and replace a door for it to swing outward into the hallway that is located in the recreation room on the 2nd floor of the Wilkes-Barre VA Medical Facility. Any work determined by the COTR as having a significant impact on the daily operations of the facility shall be conducted on an after-hours schedule. All work shall be performed in accordance with the plans and specifications. In the event of a discrepancy, the VA Specifications shall take precedence. All federal, state, and local code/regulations/standards shall be followed. b.The work will consist of removing the old door and frame and replace the door and frame with something similar. The door is to have a Yale lock set. c.The contractor shall verifying all existing conditions details and dimensions of all sizes for any and all materials that will be need to complete the replacement of the door on the 2nd floor of building one. The replacement shall consist of removal of the door and frame and replace with new door and frame, the door will swing outward. It shall be the contractor's responsibility for any/all modifications and material that are required to install all products. The contractor shall be responsible for patch and repair any wall, ceiling, doors and floors that may get damaged by the contractor during renovations. d. The above scope of work is intended to describe the project in general. The contractor shall abide by all Infection Control Risk Assessment (ICRA) guidelines when performing this project. The contractor shall protect the floor from all construction demolition. e.The contractor shall follow all federal, state, and local codes, regulations, and standards, and all work shall be performed during normal business hours 8:00AM to 4:30PM Monday to Friday excluding national holidays. The work shall be coordinated through the designated Contracting Officer's Technical Representative (COTR), Mike Somoga. All contractors shall have an identification badge on them at all times with their name and company clearly ident
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/WBVAMC693/WBVAMC693/VA24412B0451/listing.html)
- Document(s)
- Attachment
- File Name: VA244-12-B-0451 VA244-12-B-0451_1.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=317387&FileName=VA244-12-B-0451-000.docx)
- Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=317387&FileName=VA244-12-B-0451-000.docx
- Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
- File Name: VA244-12-B-0451 VA244-12-B-0451_1.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=317387&FileName=VA244-12-B-0451-000.docx)
- Record
- SN02714054-W 20120406/120404235539-932c82f6ac89dab593964fd87a55ce5c (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |