Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF APRIL 12, 2012 FBO #3792
MODIFICATION

Y -- AFRICA MULTIPLE AWARD CONSTRUCTION CONTRACTS

Notice Date
4/10/2012
 
Notice Type
Modification/Amendment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
N33191 NAVFAC EURAFSWA PSC 817 Box 51 FPO AE Naples,
 
ZIP Code
00000
 
Solicitation Number
N3319112R0400
 
Response Due
4/3/2012
 
Archive Date
7/30/2012
 
Point of Contact
Sean Duffy +39 081-568-4104
 
Small Business Set-Aside
N/A
 
Description
This modification changes the classification code from "Z - Maintenance, Repair or Alteration of Real Property" to "Y - Construction of Structures and Facilities." This modification also replaces paragraph 5 of the original pre-solicitation notice's description (N3319112R0400) in its entirety. Delete paragraph 5 of the original pre-solicitation notice and replace with the following: This solicitation will utilize a two-phase best-value tradeoff acquisition process. The evaluation factors and phases are as follows: Phase I: Factor 1 “ Technical Approach Factor 2 “ Experience Factor 3 “ Past Performance Phase II: Factor 4 “ Safety Factor 5 “ Technical Solution Factor 6 “ Energy and Sustainable Design This Two-Phase design-build (DB) procurement will result in the award of up to five (5) Indefinite Delivery/Indefinite Quantity (IDIQ) type contracts under a Multiple Award Construction Contract (MACC) structure for a one year base period with provisions for the exercise of four one-year option periods. For Two-Phase DB procurements, Factors 1-3 will be evaluated in Phase I and Factors 4-6 will be evaluated in Phase II. Factor 1 will only be rated Acceptable or Unacceptable. If an Offeror is rated Unacceptable in Factor 1, then they will not be considered for Phase II. In making the best value award decision after Phase II, the government will consider Factors 2-6 and price. The relative order of importance of the non-cost/price evaluation factors is that technical factors are equal to each other and when combined are equal importance to the performance confidence assessment (past performance). The combined non-cost/price factors are approximately equal to price.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/EFAMED/N3319112R0400/listing.html)
 
Record
SN02718845-W 20120412/120411000008-c593e75603451c7d0aa25243121ab37c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.