MODIFICATION
28 -- GUIDE,VALVE STEM
- Notice Date
- 7/6/2012
- Notice Type
- Modification/Amendment
- NAICS
- 336412
— Aircraft Engine and Engine Parts Manufacturing
- Contracting Office
- DEPARTMENT OF THE AIR FORCE; BLDG 3001 SUITE 2AH82A; TINKER AFB;OK; 73145
- ZIP Code
- 73145
- Solicitation Number
- FA8121-12-R-0032
- Response Due
- 6/19/2012
- Archive Date
- 9/3/2012
- Point of Contact
- Jon Wright, Phone: 4057394298
- E-Mail Address
-
jon.wright@tinker.af.mil
(jon.wright@tinker.af.mil)
- Small Business Set-Aside
- N/A
- Description
- Air Force Global Logistics Support Center (AF-GLSC) is contemplating to procure spares of the Line Items cited below for a FFP Contract, for the procurement of a quantity of 42 each, Guide, Valve StemTube Assembly, Metal to support the F100-200 Engine. 1. Estimated issue date and estimated closing/response date issued 19 Jun 2012, Closes 3 Aug 2012 2. PR# - FD2030-12-00380 3. Service/Spare/Repair/OH - Spares 4. AMC - 2/C 5. Item: GUIDE, VALVE STEM 6. NSN - 2810-01-532-4701 NZ 7. PN - 4088012-01 8. Description: GUIDE, VALVE STEM. CONTROLS THE AMOUNT OF COMPRESSED AIR FLOWING THROUGH THE COMPRESSOR DURING ENGINE OPERATION. 9. Total Line Item Quantity: L/I 0001 - Informational CLIN only L/I 0001AA - First Article Required - Contractor Testing - Test Plan; qty 1 lot; required delivery 30 calendar days ARO Contract L/I 0001AB - First Article Required - Contractor Testing - Test Report; qty 1 lot; required delivery 120 calendar days ARO Contract L/I 0001AC - First Article Required - Destructive Exhibit; qty 1 each; required delivery on or before 29 Mar 2013 L/I 0001AD - First Article Required - Non-Destructive Exhibit; qty 2 each; required delivery on or before 29 Mar 2013 L/I 0001AE - First Article Required - Production Units; qty 42 each; required delivery of 10 each per month starting on or before 30 September 2013 L/I 0001AF- First Article Not Required - qty 42 each; required delivery 10 each per month starting on or before 30 September 2013 10. Application (Engine or Aircraft) - F 100-200 Engine 11. Destination: L/I 0001 thru L/I 0001AD: FOB Destination, BLDG 3001 CP 405/736-7455, 3001 Staff Drive Ste 1AB85A, Tinker AFB, OK 73145-3041 L/I 0001AE & L/I 0001AF: FOB Origin, 3301 F Avenue CEN REC Bldg 506 DR 22, Tinker AFB, OK 73145-8000 12. Delivery: L/I 0001AA qty 1 lot; required delivery 30 calendar days ARO Contract L/I 0001AB qty 1 lot; required delivery 120 calendar days ARO Contract L/I 0001AC qty 1 each; required delivery on or before 29 Mar 2013 L/I 0001AD qty 2 each; required delivery on or before 29 Mar 2013 L/I 0001AE qty 42 each; required delivery of 10 each per month starting on or before 30 September 2013 L/I 0001AF qty 42 each; required delivery 10 each per month starting on or before 30 September 2013 13. Qualification Requirements: Applies 14. Export Control: n/a 15. UID: Note to Contractor: If unit price exceeds $5,000 then UID requirements will apply. 16. Buyer name, phone#, and email address: Jon Wright, 405-739-4298, dana.herndon@tinker.af.mil Electronic procedures will be used for this solicitation. IAW FAR 5.207 (c) (15) (ii), all responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OCALCCC/FA8121-12-R-0032/listing.html)
- Record
- SN02796303-W 20120708/120706235055-39eff99e90bbc67adf13f2b63d7911f3 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |