SOLICITATION NOTICE
Z -- LEWIS & CLARK NATIONAL FOREST- Partial Reconstruction of Trail 174 - Solicitation
- Notice Date
- 7/11/2012
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-1 East Side Acquisition Team: Beaverhead-Deerlodge; Custer; Helena; Gallatin; Lewis & Clark NFs; Dakota Prairie NG, Montana, United States
- ZIP Code
- 00000
- Solicitation Number
- AG-03K0-S-12-0014
- Archive Date
- 8/11/2012
- Point of Contact
- Lori Austad, Phone: 406-495-3707
- E-Mail Address
-
laustad@fs.fed.us
(laustad@fs.fed.us)
- Small Business Set-Aside
- Total Small Business
- Description
- SPS Food Storage Order Master Drawings Exhibit B Exhibit A Return Package Cover Page Solicitation The U.S Forest Service is in Need of a Trail Restoration: Interested Contractors must furnish all materials, equipment, labor, supervision, transportation, operating supplies and incidentals necessary to complete the attached project. Continental Divide Trail #174 is a trail restoration project with work at intermittent locations along 5.7 miles of trail. Items of work will be staked by the Forest Service as needed throughout the length of the project; much of the restoration will include berm removal. Trail obliteration will eliminate existing user created braided trail. This project is in the Wilderness, so no motorized or wheeled equipment shall be used. Additive/Deductive Bid Item #1 Continental Divide Trail #111 Turnpike Construction: Work Consists of the Following: Work consists of the construction of 2 sections of turnpike on Rock Cr. Trail #111. Additive/Deductive Bid Item #2 Continental Divide Trail #130 Turnpike Maintenance: Work Consists of the Following: Work consists of repairing a section of turnpike on Red Shale Trail #130. Work will include repairing the washed out approach and damaged structure. Price Range of Project: The price of these combined bid items is estimated between $25,000 and $150,000. Project Location: Directions from Choteau, MT: Continental Divide Trail #174 can be reached by traveling north from Choteau, MT on US Highway 89. Turn west on Teton Canyon Road to the Cave Mountain Trailhead. From the trailhead take Trail #108 over Route Creek Pass to Trail #109 Then travel west on Trail #151 to the project area on Continental Divide Trail #174. Pre-bid Tour: None scheduled. Interested bidders desiring to visit the worksite may contact the Rocky Mountain District at (406) 466-5341 ext. 119 for directional information. Start Work: It is anticipated that work will begin in 2012. Construction season typically begins around mid-July. Period Of Performance: Work must be completed by September 30, 2013. The Contractor shall maintain progress at a rate that will assure completion of work within the time specified above.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/398/AG-03K0-S-12-0014/listing.html)
- Place of Performance
- Address: Rocky Mountain Ranger District, 1102 Main Ave. NW, Chotaeu, Montana, 59422, United States
- Zip Code: 59422
- Zip Code: 59422
- Record
- SN02799214-W 20120713/120711235052-7fb0af3e30e93fcc734fc5d1bc51ade2 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |