SOURCES SOUGHT
99 -- ROOFING: Power Service Building Roof Replacement at the Seattle Air Route Traffic Control Center (ARTCC) located in Auburn, Washington
- Notice Date
- 7/16/2012
- Notice Type
- Sources Sought
- Contracting Office
- FEDERAL AVIATION ADMINISTRATION, ANM-52 ANM - Northwest Mountain
- ZIP Code
- 00000
- Solicitation Number
- DTFANM-12-R-00111-12030
- Response Due
- 8/8/2012
- Archive Date
- 8/23/2012
- Point of Contact
- Matthew Benbow, 425-227-2058
- E-Mail Address
-
matt.benbow@faa.gov
(matt.benbow@faa.gov)
- Small Business Set-Aside
- N/A
- Description
- If viewing this announcement from a source other than Federal Aviation Administration Contract Opportunities (FAACO) website, please visit http://faaco.faa.gov/ for the original announcement. Updates and or amendments will only be issued at http://faaco.faa.gov/. The purpose of this Request for Offers is to seek competent and qualified contractors to perform all work necessary for the Power Service Building Roof Replacement at the Seattle Air Route Traffic Control Center (ARTCC) located in Auburn, Washington in accordance with the specifications, drawings, contract clauses, and wage rates. Magnitude of base construction is $100,000 - $250,000 Notification of Competition Limited to Eligible 8(a) SEDB Concerns See Contract clause: 3.6.1-8. The NAICS Code for this project is 238160. The Small Business Administration Size Standard for NAICS Code is $14.0 million. The total contract duration for completion of all work shall be 45 calendar days after official notice to proceed for construction. The following is a general description of the work: This project has three (3) different parts to it: 1) The first part is to replace the E/G (Room 110), Switchgear (Room 109), and Battery Building (Room 101) roofs. Remove the existing roof membrane system and replace with a new 80 mil TPO membrane roof system. 2) The installation of movable guard rails on these roofs and the Control Wing roof. 3) Re-caulking all the exterior panels on the E/G building (Room 104). Remove all the existing caulk around all the exterior panels and replace with new caulking. Site Visit: The site visit is OPTIONAL, however the FAA urges and expects offerors to inspect the site where the work will be performed a. The FAA facility escort has been instructed not to answer any questions about the project during the site visit, please do not ask them any. All questions from the site visit must be submitted in writing according to the RFO's instructions in Section B004 Solicitation Questions b. To attend a site visit, advance notice by e-mail or telephone is required to the FAA POC identified below. You will be required to provide your company representative's name, title and cell phone number. FAA POC: Marc Nagel Office: (425) 227-1554 E-mail: marc.nagel@faa.gov Submission of Offer: PROPOSALS ARE DUE NO LATER THAN 12:00PM ON AUGUST 8, 2012. Please see Section "L" of the Request for Offers for complete proposal submission information.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FAA/NMR/DTFANM-12-R-00111-12030/listing.html)
- Record
- SN02803936-W 20120718/120716235016-8d2a1e611fb51ef6db47eade8b896fcb (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |