Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY ISSUE OF JULY 28, 2012 FBO #3899
DOCUMENT

Y -- HI A-AD 6(7), Saddle Road- West Side - Solicitation 1

Notice Date
7/26/2012
 
Notice Type
Solicitation 1
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH68-12-B-00004
 
Archive Date
9/8/2012
 
Point of Contact
Jeremiah Rogers, Phone: 7209633090, Aaron L. Sanford, Phone: 7209633090
 
E-Mail Address
cflcontracts@dot.gov, cflcontracts@dot.gov
(cflcontracts@dot.gov, cflcontracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Invitation for Bid (IFB) which includes Special Contract Requirements. The work will be located on the Island of Hawaii along a new alignment for Saddle Road (State Route 200) between Mamalahoa Highway (State Route 190) and Milepost 41 of existing Saddle Road. The project is 10.5 miles in length and the limits begin near Mile Post 14 along the Mamalahoa Highway (south of Waikoloa Road) and terminates near milepost 41.5 of existing Saddle Road. The project consists of one (1) contract schedule and one (1) option which includes aggregate base, paving, bridge construction, grading (anticipated excavation materials include volcanic ash, a'a and pahoehoe lava), signing, striping, and erosion control construction activities. Schedule A (Approximately 10.5 miles in length) - Significant items include (approximate quantities subject to change): 55,800 CY of embankment construction; 32 acres of clearing and grubbing; 162,000 Tons of aggregate base; 61,000 Tons of Hot Asphalt Pavement; 75 Tons of Fog Seal; 220 Tons of Prime Coat; 4 Tons of Tack Coat; 1 Bridge Structure; 20,400 LF of 4 inch asphalt curb; 4,580 LF of guardrail; 7,000 MGAL of watering for dust control and earthwork; 2,150 LF of 24 inch culver pipe; 230 LF of 30 inch culvert pipe; 700 CY of rip rap; 15,000 GAL of dust palliative; 17,000 LF of Silt Fence; 14,000 SY of rolled erosion control product, Type 3.B; and 7,100 CY of placing conserved topsoil; 183 Sign Systems; and 518,500 LF of Pavement Markings. Option X (Approximately 10.5 miles in length) - Significant items include (approximate quantities subject to change): 43,000 Tons of Superpave; 620 Tons of Antistrip Additive; 71 Tons of Tack Coat, and 104,000 LF of Rumble Strips. Estimated cost for the base schedule and option is $25 to $40 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-12-B-00004/listing.html)
 
Document(s)
Solicitation 1
 
File Name: Link to the CFLHD website where you can download plans, find the Question/Answer page, plan holders, Geotech report, and more. (http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm)
Link: http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: Pu'Uke'eke'E Game and Waiki'i Paddock Game Management Area, Waikoloa, Hawaii, 96738, United States
Zip Code: 96738
 
Record
SN02816417-W 20120728/120726235939-9b1bdb9e794ec25f838a1200af4ea9bb (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.