Y -- NV PRA LAME 112-1(1), ECHO BAY ACCESS ROAD - Solicitation 1
- Notice Date
- 7/26/2012
- Notice Type
- Solicitation 1
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
- ZIP Code
- 80228
- Solicitation Number
- DTFH68-12-B-00008
- Archive Date
- 9/8/2012
- Point of Contact
- Aaron L. Sanford, Phone: 7209633090, Jeremiah B. Rogers, Phone: 7209633090
- E-Mail Address
-
aaron.sanford@dot.gov, jeremiah.rogers@dot.gov
(aaron.sanford@dot.gov, jeremiah.rogers@dot.gov)
- Small Business Set-Aside
- N/A
- Description
- Invitation for bid (including Special Contract Requierments) This project will be advertised on a full and open (unrestricted) basis. PROJECT NUMBER: NV PRA LAME 112-1(1) PROJECT NAME: Echo Bay Access Road PROJECT DESCRIPTION: The project consists or 4Rwork on Echo Bay Access Road (rehabilitating, restoration and rehabilitation and reconstruction). The reconstruction portion of this consists of some realignment of the curves on the roadway to improve the grade of the overall roadway This route is the last portion of improvement along the Northshore Road at Lake Mead and this section accesses the Echo Bay Marina area in the park. This work consists of improving the roadway pavement section with pulverized pavement, aggregate base coat, tack coat, hot asphalt concrete pavement and open graded friction course on the roadway section. The project also consists of shoulder reconditioning, guardrail, concrete curb, sidewalk and curb ramp, culvert pipe, signing and striping. The pavement area of the work starts at the north end of this route at the junction with Northshore Road and extends southeasterly to the Echo Bay Marina and parking area. SIGNIFICANT QUANTITIES: o Schedule A - 6.789 km of roadway paving and pullouts. Total of 10,391 cubic meters of Roadway Excavation. Approximately 23,005 metric tons of Aggregate Base. Approximately 8.67 km of Shoulder Reconditioning. Approximately 10,079 metric tons of Hot Asphalt Concrete Pavement. Approximately 2,063 meters of concrete curb. Approximately 2,023 tons of Open graded Asphalt Friction Course. ENGINEER'S ESTIMATE: Estimated Construction Cost Range for Schedule A $4-7 million. CONSTRUCTION DURATION: Tentative construction duration is from September 1, 2012 to March 31, 2013
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH68-12-B-00008/listing.html)
- Document(s)
- Solicitation 1
- File Name: Link to the CFLHD website where plans, reports, amendments, questions and answers may be viewed or downloaded. (http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm)
- Link: http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm
- Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
- File Name: Link to the CFLHD website where plans, reports, amendments, questions and answers may be viewed or downloaded. (http://www.cflhd.gov/contracting/construction/AdvertisedProjects.cfm)
- Place of Performance
- Address: Lake Mead National Recreation Area, Las Vegas, Nevada, 89005, United States
- Zip Code: 89005
- Zip Code: 89005
- Record
- SN02816974-W 20120728/120727000700-c9a2e76146e8c9dc4c742c04632c726f (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |