SOLICITATION NOTICE
29 -- TUBE ASSEMBLY, METAL
- Notice Date
- 7/31/2012
- Notice Type
- Presolicitation
- NAICS
- 336412
— Aircraft Engine and Engine Parts Manufacturing
- Contracting Office
- DEPARTMENT OF THE AIR FORCE; BLDG 3001 SUITE 2AH82A; TINKER AFB;OK; 73145
- ZIP Code
- 73145
- Solicitation Number
- FA8121-12-B-0010
- Response Due
- 8/30/2012
- Archive Date
- 11/28/2012
- Point of Contact
- Jon Wright, Phone 405-739-4298, Fax - -, Emailjon.wright@tinker.af.mil - Terra Washington, Phone 405-739-4212, Fax- -, Email terra.washington@tinker.af.mil
- E-Mail Address
-
Jon Wright
(jon.wright@tinker.af.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- Air Force Global Logistics Support Center (AF-GLSC) is contemplating a spares procuremnt of the Line Items cited below for a Firm Fixed Price, Multi-Year Contract, for a current year quantity of 129 each, Tube Assembly, Metal to support the F100-200 Engine. 1. Estimated issue date and estimated closing/response date: issued 31 July 2012 and Closes 30 Aug 2012. 2. PR#: FD2030-12-00408 3. Service/Spare/Repair/OH: Spares 4. AMC: 1/C 5. Item: TUBE ASSEMBLY, METAL 6. NSN: 4710-01-317-6082 NZ 7. PN: 4069160 8. Multi-Year Contract: CY = 129 ea; FY13 = 42 each; FY14 = 50 each; FY15 = 40 each. Minimum order = 11each; Maximum order = 66 each 9. Description: IN THE F100-229 ENGINE, THE TUBE ASSEMBLY IS PART OF THE #4 BEARING AREA AND PROVIDES A RETURN PATH FOR OIL RETURNING BACK TO THE OIL TANK (INTERNAL IN THE DIFFUSER CASE). 10. Total Line Item Quantity: L/I 0001 - Informational CLIN only L/I 0001AA - First Article Required - Contractor Testing - Test Plan; qty 1 lot; required delivery 30 calendar days ARO Contract L/I 0001AB - First Article Required - Contractor Testing - Test Report; qty 1 lot; required delivery 120 calendar days ARO Contract L/I 0001AC - First Article Required - Destructive Exhibit; qty 1 each; required delivery on or before 15 FEB 2013 L/I 0001AD - First Article Required - Non-Destructive Exhibit; qty 2 each; required delivery on or before 15 MAR 2013 L/I 0001AE - First Article Required - Production Units; qty 129 each; required delivery of 10 each per month starting on or before 30 APR 2013 L/I 0001AF- First Article Not Required - Production Units; qty 129 each; required delivery 10 each per month starting on or before 30 APR 2013 11. Application (Engine or Aircraft): F 100-200 Engine 12. Destination: L/I 0001 thru L/I 0001AD: FOB Destination, BLDG 3001 CP 405/736-7455, 3001 Staff Drive Ste. 1AB85A, Tinker AFB, OK 73145-3041 L/I 0001AD thru L/I 0001AF: FOB Origin, 3301 F Avenue CEN REC Bldg 506 Door 22, Tinker AFB, OK 73145-8000 13. Delivery: L/I 0001AA: qty 1 lot; required delivery 30 calendar days ARO Contract L/I 0001AB: qty 1 lot; required delivery 120 calendar days ARO Contract L/I 0001AC: qty 1 each; required delivery on or before 15 Feb 2013 L/I 0001AD: qty 2 each; required delivery on or before 15 Mar 2013 L/I 0001AE: qty 129 each; required delivery 10 each per month starting on or before 30 Apr 2013 L/I 0001AF: qty 129 each; required delivery 10 each per month starting on or before 30 Apr 2013 14. Qualification Requirements: Applies 15. Export Control: N/A 16. UID: Note to Contractor: If unit price exceeds $5,000 then UID requirements will apply. 17. Buyer name, phone#, and email address: Jon Wright, 405-739-4298, jon.wright@tinker.af.mil Duration of Contract Period: MULT-YEAR CONTRACT Electronic procedures will be used for this solicitation. IAW FAR 5.207 (c) (15) (ii), all responsible sources may submit a capability statement, proposal, or quotation, which shall be considered by the agency.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/OCALCCC/FA8121-12-B-0010/listing.html)
- Record
- SN02820828-W 20120802/120731235156-7139659ee711c0af64cf89ad93cb455a (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |