DOCUMENT
Z -- EMERGENCY CAMPUS GENERATOR - Attachment
- Notice Date
- 9/5/2012
- Notice Type
- Attachment
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- Department of Veterans Affairs;VAMC;1400 Blackhorse Hill RD;Coatesville PA 19320
- ZIP Code
- 19320
- Solicitation Number
- VA24412B0380
- Response Due
- 9/13/2012
- Archive Date
- 12/12/2012
- Point of Contact
- Toni Barber
- E-Mail Address
-
384-7711
- Small Business Set-Aside
- Service-Disabled Veteran-Owned Small Business
- Description
- Pre-Bid Questions and Answers VA244-12-B-0380 Amendment 0002 1.01 00 00 - 10, item 1.6, F, Phase 6, Will a temporary fence be required around the Temporary generators when they are in place at each of the existing generator building during the switchovers? Yes, a temporary (secure) construction fence is required around the temporary generators for the duration of the project. The COTR will provide direction for location and layout. 2.The table of contents list Divisions 14, 21, 22, 25 and 33 but there are no specifications. Is this correct or did I miss them in the downloading? Only the specification sections listed are a part of the project; Division heading with no sections do not apply. 3.01 00 00 - 23, item 1.18, A, Are there sewer and water facilities near the location of the work for the temporary toilet tie in? Contractor to provide temporary toilets, hand washing stations, etc ¦ as required. No tie-ins to VA sewer or water facilities. 4.01 00 00 - 4, item 1.4, C, Will the VA security office have radios available for use by the contractors after hours guards? COTR shall provide contact information for the police. No equipment will be provided by the VA. The Contractor is responsible to maintain a secure worksite at all times. 5.01 00 00 - 2, item 1.2, A, 2, d, Who will provide the 28,000 gallons of Fuel for the initial fill of the tanks. Who will provide the fuel for the commissioning and testing? This is answered in the specifications. Per section 26 32 13, 3.2 L., all fuel tanks are to be filled upon completion of final testing. Contractor supplies all fuel for testing prior to final system acceptance by the government. 6.With reference to Amendment #1, we find the attachment drawings to be only partially viewable, is it our computer or the attachments? Only the relevant section of the drawing was included in Amendment #1.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/CoVAMC542/CoVAMC542/VA24412B0380/listing.html)
- Document(s)
- Attachment
- File Name: VA244-12-B-0380 0002 VA244-12-B-0380 0002.doc (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=467444&FileName=VA244-12-B-0380-0002000.doc)
- Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=467444&FileName=VA244-12-B-0380-0002000.doc
- Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
- File Name: VA244-12-B-0380 0002 VA244-12-B-0380 0002.doc (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=467444&FileName=VA244-12-B-0380-0002000.doc)
- Record
- SN02868164-W 20120907/120906000815-2bf38afee405a9065e305aa156f2d21e (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |