AWARD

Z -- Barkley Dam Tainter Gate Painting, Grand Rivers, Lyon County, KY

Notice Date
9/7/2012
 
Notice Type
Award Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
USACE District, Nashville, P.O. Box 1070, 801 Broad Street, Nashville, TN 37202-1070
 
ZIP Code
37202-1070
 
Solicitation Number
W912P5-12-B-0006
 
Response Due
8/9/2012
 
Archive Date
10/7/2012
 
Point of Contact
Heather Keeling, 615-736-7939
 
E-Mail Address
USACE District, Nashville
(heather.d.keeling@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912P5-12-C-0009
 
Award Date
8/30/2012
 
Awardee
OSTROM PAINTING & SANDBLASTING, INC. (125137083) <br> 1110 8TH AVE<br> ROCK ISLAND, IL 61201-2419
 
Award Amount
$4,208,704.00
 
Line Number
0001
 
Description
Barkley Dam is located at river mile 30.6 above the mouth of the Cumberland River in Western Kentucky. The Dam is adjacent to the town of Grand Rivers, KY along State Highway 62. The Dam is comprised of two embankment sections, a navigation lock, a powerhouse, and a spillway section. The spillway section is made of 12 tainter steel gates each 50 feet tall by 55 feet wide mounted on concrete spillway piers. The gates are operated by overhead machinery. The spillway section also includes an overhead gantry crane which is used to move bulkheads for unwatering and performing maintenance on the gates. The project includes only enough bulkheads to unwater one gate at a time. Access to the tainter gates is best from the east side at the powerhouse. The 12 tainter gates have many areas of light corrosion and a few areas of heavier corrosion. The upstream skin plate paint does not contain lead. Downstream skin plate, strut arms, diagonal bracings, stiffeners, vertical ribs, trunnion anchor beams and other coated metal on the gate contain lead. The work covered by this contract includes surface preparation and coating of the spillway gates. The Contractor shall also remove and dispose of all wood, tires, buoys or other debris collected on the gates. The Contractor shall provide all materials, equipment, and labor necessary to complete the work and ensure that the spillway gates and appurtenant areas are clean and ready for operation. The Contractor shall also be responsible for disposing of any materials removed from the gates during this work. The bid schedule is set up with the base bid to include gates 1, 3, 10, 11, and 12 and each of the remaining gates is set up as an option.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA62/W912P5-12-B-0006/listing.html)
 
Record
SN02873893-W 20120909/120908002535-10e68d0472b04417f041caadb8cd024b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.