MODIFICATION

Z -- Demolition Project

Notice Date
9/11/2012
 
Notice Type
Modification/Amendment
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
Department of the Air Force, Air Combat Command, 99 CONS, 5865 Swaab Blvd, Nellis AFB, Nevada, 89191-7063, United States
 
ZIP Code
89191-7063
 
Solicitation Number
FA4861-12-B-0002
 
Archive Date
10/2/2012
 
Point of Contact
Neil E. Armstrong, Phone: 7026529564
 
E-Mail Address
neil.armstrong@nellis.af.mil
(neil.armstrong@nellis.af.mil)
 
Small Business Set-Aside
Woman Owned Small Business
 
Description
Revised Addendum #2 to DEMO MISCELLANEOUS FACILITIES RKMF 12-0121 Bldg 601 RKMF 12-0144 Bldg 4856 Please change the following paragraphs to read as follows: 1.3 DESCRIPTION OF WORK 1.3.2 DEMOLITION SEGMENT: 1.3.2.12 Construction Install 6ft high galvanized dark green vinyl coated chain link perimeter fencing, with three 3 ft wide personnel entry gates and two 12ft wide double-gated latched entries. Install soil stabilization on bare soil within new fenced area. Reconfigure existing irrigation system to feed all remaining trees on site. Redesign storm water drainage to have a 5-degree natural slope with a head wall on the north side of east entrance to the parking lot, and with all asphalt work required to provide positive drainage to the inlet on the south side of the parking lot. Relocate 4 storage sheds and 1-polar king freezer. Storage shed 1 and storage shed 2 will be relocated to the north end of building 602, next to the metal shed and shall be placed on 4x4's. Storage shed 3 and the polar king freezer shall be relocated to area 3, north of building 2999. Shed 3 will be placed on 4x4's and a concrete pad, ramp and power from the mechanical room will need to be installed for polar freezer in area 3. Shed 4 will be relocated just outside the new perimeter fencing of the demolition area. Contractor shall provide 35% design drawings for the site after demolition including fence layout and drainage reconfiguration. The chiller, boiler and all Johnson network controls will be removed by 99 CES prior to demolition. 1.7 PERFORMANCE PERIODS & NOTICE(S) TO PROCEED: 1.7.1 The performance period for the abatement/construction portion of this project is 35 calendar days for building 4856 and 49 calendar days for building 601 after receipt of the Notice to Proceed. At the beginning of the performance window, and if all necessary submittals have been approved by the Contracting Officer, the Contracting Officer shall initiate Notice to Proceed (NTP) to allow actual demolition/construction work to begin. 1.7.2 One Notice to Proceed will be provided for each individual facility. Bldg 4856 will be demolished first without delay but Bldg 601 may not be available for demolition until approximately June of 2013. End Revised Addendum #2
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/ACC/99CONS/FA4861-12-B-0002/listing.html)
 
Place of Performance
Address: Nellis AFB, Nevada, 89191, United States
Zip Code: 89191
 
Record
SN02876685-W 20120913/120912000311-71068419db7705be20e386618c959963 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.